first you need to convert all of the measurements into one units. Lets use ft as the universal unit in this case.
8ft = 8ft (Obviously!)
2in = 1/6ft
3yd = 9ft
8ft by (1/6)ft by 9ft = 12ft
Volume = 12ft
There are 3 ft in a yd, so to convert from yd to ft you multiply the number of yd by 3. In this case we have 2yd, so multiply that by 3 and we get 6ft. Add that on to the 2ft already stated, and we have 6+2=8ft. Thus there are 8ft in 2yd 2ft.
The volume can't be determined for this type of situation since we have only 2 values to multiply altogether. You need three values with compatible length units to obtain the volume. For instance: 3 yd by 4 yd by 5 yd gives 60 yd³. This is the example of the volume.
3 ft = 1 yd volume = 12 ft x 12 ft x 2 ft = 12 ÷ 3 yd x 12 ÷ 3 yd x 2 ÷ 3 yd = 10 2/3 cu yd ≈ 10.67 cu yd
1 yd = 3 ft 2 yds = 6 ft 8 ft is more than that.
The volume is 27yd3
3 ft = 1 yd → 8 ft = 8 ÷ 3 yd = 2 2/3 yd ≈ 2.67 yd
It is a volume 1 yd x 1 yd x 1 yd or 3 ft x 3 ft x 3 ft.
3 yd = 1 ft → volume = 120 ft × 40 ft × 1 ft = (120 ÷ 3) yd × (40 ÷ 3) yd × (1 ÷ 3) yd = 4800 ÷ 27 yd³ = 177 7/9 cu yd ≈ 177.78 cubic yards.
2 yd 2 ft
The volume of the box is 36 * 24 * 18 = 15552 cubic inches. ---------------------------------------------- 1 ft = 1/3 yd → volume = 1 yd × 2 ft × 1.5 ft = 1 yd × (2 × 1/3) yd × (1.5 × 1/3) yd = 1/3 cu yd = 0.333... cu yd ≈ 0.33 cu yd 1 yd = 0.9144 m (exactly)* → 1 cu yd = 1 yd × 1 yd × 1 yd = 0.9144 m × 0.9144 m × 0.9144 m = (0.9144)³ cu m → 1/3 cu yd = 1/3 × (0.9144)³ cu m = 497757069/1953125000 cu m = 0.25485.... cu m ≈ 0.25 cu m * derivation of 1 yd = 0.9144m (exactly): 1 in = 2.54 cm = 0.0254 m (exactly) 1 yd = 36 in = 36 × 0.0254 m = 0.9144 m (exactly) If you are using an approximation for 1 inch in centimetres, then 1 yd ≈ 36 × approximation ÷ 100 metres. eg if 1 in ≈ 2.5 cm, then 1 yd ≈ 36 × 2.5 ÷ 100 m = 0.9 m and volume ≈ 1/3 × (9/10)³ cu m = 243/1000 cu m = 0.243 cu m
Convert all of the measures to yards.48 feet (1 yd / 3 feet) = 48 feet (1 yd / 3 feet) = 16 yd24 feet (1 yd / 3 feet) = 24 feet (1 yd / 3 feet) = 8 yd72 inches (1 ft / 12 in) (1 yd / 3 ft) = 72 inches (1 ft / 12 in) (1 yd / 3 ft) = 2 ydCalculate the volume.16(8)(2) = 256 yd3
To find the volume of a rectangular prism, you multiply (length)(width)(height). In this case, you multiply 6 times 5 times 3, and your answer is 180.
1 yd = 3 ft → 1 sq yd = 1 yd x 1 yd = 3 ft x 3 ft = 9 ft 1 yd = 36 in → volume = 4800 sq ft x 5 in = 4800 ÷ 9 sq yd x 5 ÷ 36 yd = 74 2/27 cu yd ≈ 74.074 cu yd.
6 ft / 3 ft/yd = 2 yd
5.5^2*3.25/3
3 ft = 1 yd 6 ft = 2 yd 9 ft = 3 yd . . 36 ft = 12 yd
3 ft = 1 yd 6 ft = 2 yd 9 ft = 3 yd . . 36 ft = 12 yd
3 ft = 1 yd → 240 ft × 2 ft × 6 ft = (240 ÷ 3) yd × (2 ÷ 3) yd = (6 ÷ 3) yd = 80 yd × ⅔ yd × 2 yd = 106⅔ cu yd ≈ 106.67 cu yd If you are ordering skips to contain the spoil from a hole dug to those dimensions you will need to order more capacity as the spoil will be loose and take up more volume.
Volume = Width x Length x Height Convert your values to feet: 2 yd x 3 yd x 1 yd = 6 ft x 9 ft x 3 ft = 162 cubic yards.
64.8 square feet 36 in = 1 yd 1 cu yd = 1 sq yd x 1 yd 1 yd = 3 ft 1 sq yd = 1 yd x 1 yd = 3 ft x 3 ft = 9 sq ft volume = area x thickness ⇒ area = volume ÷ thickness = 1 sq yd x 1 yd ÷ 5 in = 1 sq yd x 1 yd ÷ (5 ÷ 36) yd = 7.2 sq yd = 7.2 x 9 sq ft = 64.8 sq ft
1 yd = 36 in 6 yd 5 in - 2 yd 7 in = (5 + 1) yd 5 in - 2 yd 7 in = 5 yd (36 + 5) in - 2 yd 7 in = (5-2) yd (36 + 5 - 7) in = 3 yd 34 in.
6 yards
1/3*pi*radius squared*height of cone=volume
Assuming you're using the colloquial "yard" for the "cubic yard" unit of volume and not the "yard" unit of length:3 ft = 1 yd36 in = 1 ydvolume = 24 ft x 12 ft x 4 in= (24/3) yd x (12/3) yd x (4/36) yd= 32/9 cu yd= 35/9 cu yd≈ 3.56 cu yd
9 yd 2 ft. Incidentally, 2 yd 4 ft is a strange way of representing a distance of 3 yd 1 ft.