1:1:2

User Avatar

Eliane Labadie

Lvl 9
2y ago

What else can I help you with?

Related Questions

What is a development length and how to calculate for M30 grade concrete and Fe500 grade steel?

M 25


What is consumption of cement in M25 grade concrete?

cement consumption in M-25


What is the ratio of cement and sand and crushed stone in mix concrete of M-25?

The ratio of cement, sand and crushed stone in M 25 grade concrete is 1:1:2.In this grade of concrete a compressive strength not less than 25 N/mm2 is achieved in 28 days.


Concrete grade M 30?

What is mixing ratio for concrete grade 30


What is the density of grade 25 concrete?

The Civil Engineering Data Standards manual states the density of many grades of concrete. Standard density for fresh M-25 concrete is: 2414 Kg/ M3.


Concrete mixing proportion for M 40 concrete?

The mix proportion for M40 concrete is 1:1.65:2.92W/C ratio = 0.4The design calculation is as per IS mix design


What is the density of M-25 grade concrete?

The Civil Engineering Data Standards manual states the density of many grades of concrete. Standard density for fresh M-25 concrete is: 2414 Kg/ M3.


What is the density of M-40 grade concrete?

2503.4


What is m 30 concrete?

It is the grade of concrete which indicates the strength of concrete after 28 days curing. M #) means the strength of concrete after 28 days of curing will be 30 N/mm2 .


What is the number of bags of cement required for 1 cubic meter of M25 grade cement?

For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.


What is the number of bags of cement required for 1 cubic meter of M15 grade cement concrete?

M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50


What is the maximmum Allowable stress in concrete M 25?

stress in old concrete