answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: What is relationship exists among layout capacity and scheduling?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is relationship between lay out decisions capacity decision and scheduling?

what relationship exists among the layout decisions,capacity decisions and scheduling


What is the relationship between model page and layout?

a model page is an example; a layout is how it's organized


What is the capacity of a320?

The Airbus A320-200 has a maximum certified seating capacity of 180 seats. However it is usually configured for 150 seats in a 2 class layout and 164 seats in a single class layout.


What are Operations management decisions?

1. Goods and service design 2. Quality 3. Process and capacity design 4. Location 5. Layout design 6. Human Resources and Job Design 7. Supply Chain Management 8. Inventory management 9. Scheduling 10. Maintenance


How are the seats on Airbus 321?

The Airbus A321 has a maximum certified seating capacity of 220 seats. However it is usually configured for 185 seats in a 2 class layout and 199 seats in a single class layout.


How many pasengers in airbus a319?

The Airbus A319 has a maximum certified seating capacity of 156 seats. However it is usually configured for 124 seats in a 2 class layout and 134 seats in a single class layout.


How many seats on an Airbus A321?

The Airbus A321 has a maximum certified seating capacity of 220 seats. However it is usually configured for 185 seats in a 2 class layout and 199 seats in a single class layout.


How many people can an airbus A321 carry?

The Airbus A321 has a maximum certified seating capacity of 220 seats. However it is usually configured for 185 seats in a 2 class layout and 199 seats in a single class layout.


How many people can fit in a airbus 321?

The Airbus A321 has a maximum certified seating capacity of 220 seats. However it is usually configured for 185 seats in a 2 class layout and 199 seats in a single class layout.


What are the objectives of facility layout?

A model facility layout should be able to provide an ideal relationship between raw material, equipment, manpower and final product at minimal cost under safe and comfortable environment. An efficient and effective facility layout can cover following objectives:To provide optimum space to organize equipment and facilitate movement of goods and to create safe and comfortable work environment.To promote order in production towards a single objectiveTo reduce movement of workers, raw material and equipmentTo promote safety of plant as well as its workersTo facilitate extension or change in the layout to accommodate new product line or technology upgradationTo increase production capacity of the organization


What are the responsibilities of an operations manager?

The responsibilities of an operations manager involves the process of planning, designing, and operating production systems and subsystems.Most managers have operations management responsibilities; these include product design, facility location, facility design and layout, quality assurance, materials management and inventory control, scheduling, and maintenance planning.When managing warehouse or transport staff, the role may also include:Implementing health and safety proceduresManaging staff training issuesMotivating other members of the teamProject managementSetting objectives.Organized as in the following:Design and planning:Product design; Capacity planning; Process design; Technologies; Facility design and Layout; Job design work organization; Product quality assurance.Operation and control:Aggregate / intermediate term planning; Material management and inventory control; Maintenance; Scheduling personnel, equipment and jobs; Distributions and logistics.


Types of plant layout?

Types of plant layout include combined layout, process layout, project layout and product layout.