Want this question answered?
curve fitting is a very difficult and time wasting method while regrresion is more to use as compare to curve fitting
Slope = (vertical change)/(horizontal change), commonly referred to as rise/run. If the graph is a straight line, then you can count squares or measure how much change in vertical, over a specified change in horizontal. If it is a curve, then you need to have a tangent line (a line that touches the curve at a specific point and has the same slope as the line), then you can determine the slope of that line using the method described, above.
Assumptions to determine the PPC is:only 2 goods will be illustratedthe amount of resources is fixedstate of technology is constant
Mean and Standard Deviation
Mass-Curve is a plot of the cumulative flow volumes as function of time. It is used to determine the critical period of a reservoir showing the relationship between withdraw and addition to the reservoir.
histpry
A Bézier curve is a parametric curve defiend by a set of control points, two of which are the ends of the curve, and the others determine its shape.
calibration curve helps you determine the value of a unknown substance
a supply curve and a demand curveA supply curve and a demand curve.
a supply curve and a demand curveA supply curve and a demand curve.
Improvement of management efficiency.
An improvement in telephone technology.
The three characteristics of a supply curve are the slope, shift, and the curve's position. Together they help determine supply and demand trends.
A bezier is another term for a Bézier curve, a parametric curve defiend by a set of control points, two of which are the ends of the curve, and the others determine its shape.
curve fitting is a very difficult and time wasting method while regrresion is more to use as compare to curve fitting
the different methods are: 1. Linear method. 2. Angular method.
Supply curve