If what you state in this question is accurate this is an illegal installation. A 100 amp service can not have any equipment connected to it less that that of the service size. The 60 amp main panel must be a 100 amp panel to be a legal installation.

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the largest sub panel you can install off from a 60 amp main panel fed by 100 amp service?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Natural Sciences

A 60 amp electrical service panel at a 2800 square foot home would be?

If it was preinstalled, it may have been adequate at the time of installation. It depends on the power requirements of the home. If this is a new install, the NEC has a minimum of 100A for service equipment. To be honest, I would install 200A minimum to allow for future expansion.


How would you extend underground wire to your panel currently aluminum wire run to panel about 300ft I need to extend this to a new shop with a 100 amp panel 50 extra feet?

This is not a job for an amateur, but I will help you with some primary considerations. My answers are based on the United States' NEC (code) and do not take into consideration any local requirements. You do not want to extend your existing service conductors. You want to install a 100amp breaker into your existing panel and run conductors from there to your new panel. If this is a residential application you can run this with #4 copper conductors. If this is a commercial application you must run #3 copper conductors. I would answer this question based on what your shop is intended to do. If you are running professional equipment and are more or less "in business", use the commercial requirements. If you know how to properly ground a new service, and if your new panel has a main breaker, you can do what you need with 3 conductors. This will allow you to put neutral and ground conductors on the ground bar like you would in your primary panel. If you do not know how to properly ground a new service or doing so is not practical, you will need 4 conductors and your grounds and neutrals will have to be ISOLATED from each other in the new panel. Your neutral bar in this case would be insulated from the panel. In this case your new panel would become a sub-panel of the primary panel. Some panels do not have a main breaker and this is a critical consideration if you intend to wire it as a new service. Personally, I wouldn't install a panel without a main breaker whether or not it is a service or sub-panel.


Why do you isolate the neutral?

If you are working with a sub panel, there are a few reasons to isolate the neutral. Firstly, currents will then return to the main panel and service ground.


What size service cable for 100 amp main panel 100 feet away?

20Sqmm


How do you find out how big your main breaker box is?

Simple. Your main electrical panel will have a "main breaker". This will be a two pole breaker, usually at the top of the panel. It will have a number on the breaker "handle" such as 150 or 200. This is the maximum number of amps your panel can supply. Most newer homes, 1975 and newer have a 200 amp service.

Related questions

Where is the proper location for a main breaker in a panel?

Normally the main is on the top but you can install a service panel with the main on the bottom unless local codes prohibit it.


Is it against code to install a main panel on a outside wall of a bathroom?

It is against code to install a main panel on a outside wall of a bathroom.


A 60 amp electrical service panel at a 2800 square foot home would be?

If it was preinstalled, it may have been adequate at the time of installation. It depends on the power requirements of the home. If this is a new install, the NEC has a minimum of 100A for service equipment. To be honest, I would install 200A minimum to allow for future expansion.


How much does it cost to move an electricity meter?

The meter is typically installed in the main circuit panel of the house. If you want to move it, you can do it as part of a service / panel upgrade. We did this when we moved into our new house - we replaced the 1950s vintage main circuit panel and 100A service with a newer 200A panel and service. It was about a grand, but we didn't actually move the panel from where it was, so it may cost more for what you want.


What is the minimum size breaker panel for a home's main service?

50 amps


Is it unsafe to have 60A service going into a new electrical box designed for 100A?

Its not recommended because your new main breaker will allow up to 100 amps and your old wire can only safely handle 60amps. If you put a 60amp main breaker in the new box, that would be acceptable. No, it is perfectly safe. Because the box is overrated, there is no problem. If the box is the main panel, and not a subpanel, install a 60A main breaker so you cannot overload your service. If it is a subpanel this 60A breaker should be in the main panel.


Why are use plate Repeater in the fire alarm system and Where to install?

Plate Repeater is used in the fire alarm system so that it shows the same information that the main control panel does. The repeater panel looks a lot like the main control panel and can be placed up to 30 meters from the main control panel.


What is the minimum size breaker panel required for a homes main service?

50 amps


The main service cable entering a building is first connected to what?

It is connected to the cut out fuse which enables isolation of the circuit from the supply when there is a fault.Additional Information:The service cable is usually connected to a meter fixture and from there to the main electric panel which will have a breaker to isolate the panel.


How would you extend underground wire to your panel currently aluminum wire run to panel about 300ft I need to extend this to a new shop with a 100 amp panel 50 extra feet?

This is not a job for an amateur, but I will help you with some primary considerations. My answers are based on the United States' NEC (code) and do not take into consideration any local requirements. You do not want to extend your existing service conductors. You want to install a 100amp breaker into your existing panel and run conductors from there to your new panel. If this is a residential application you can run this with #4 copper conductors. If this is a commercial application you must run #3 copper conductors. I would answer this question based on what your shop is intended to do. If you are running professional equipment and are more or less "in business", use the commercial requirements. If you know how to properly ground a new service, and if your new panel has a main breaker, you can do what you need with 3 conductors. This will allow you to put neutral and ground conductors on the ground bar like you would in your primary panel. If you do not know how to properly ground a new service or doing so is not practical, you will need 4 conductors and your grounds and neutrals will have to be ISOLATED from each other in the new panel. Your neutral bar in this case would be insulated from the panel. In this case your new panel would become a sub-panel of the primary panel. Some panels do not have a main breaker and this is a critical consideration if you intend to wire it as a new service. Personally, I wouldn't install a panel without a main breaker whether or not it is a service or sub-panel.


Why do you isolate the neutral?

If you are working with a sub panel, there are a few reasons to isolate the neutral. Firstly, currents will then return to the main panel and service ground.


What size service cable for 100 amp main panel 100 feet away?

20Sqmm