It depends on the size of the bricks.
1:6 brick work sand consumption for 1 cubic meter = 9.71 cft 1 cubic meter brick work cement consumption = 1.32 bags 1.32/28.8= .0458 cubic meter .458*6 = .275 .275*35.31 =9.71 cft
multiplyL xW x H to find the volume of 1 brick. Each measurement should be in cm. 1 cubic meter = (100 cm)3 = 1,000,000 cm3 now divide the volume of 1 brick INTO 1,000,000 that gives the number of bricks.
28.60kn
500 number of bricks are required for 1C/m
Measure the average length, breadth and width of a brick. Calculate the volume of the brick as L*B*W cubic units Divide 1 by the volume of each brick, with appropriate adjustment for measurement units.
No cubic decimeters are in a meter. There are 1000 cubic decimeters in 1 cubic meter.
it has approximately 500 bricks and weight may range from 1510-2000 kg
1 meter = 10 decimeter 1 cubic meter = 1000 cubic decimeter
1 liter = 0.001 cubic meter 1 cubic meter = 1,000 liters
1 liter = 1000 milliliters 1 milliliter = 1 cubic centimeter 1 liter = 1000 cubic centimeter 1 cubic meter = 1,000,000 cubic centimeter 1 cubic meter = 1,000,000 milliliter 1 cubic meter = 1000 liter OR 1 liter = 0.001 cubic meter
There are 35.3147 cubic feet in 1 cubic meter.
Since 1 cm = 0.01 meter, 1 cubic cm = 0.013 cubic meter. (1/1,000,000 of a cubic meter)