answersLogoWhite

0


Best Answer

17 INCHES

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: When using the sand grid repair method the crater is backfilled with a minimum of 6 inches of fill material to within how many inches below the original pavement surface?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

The support disks hold cable off the pavement surface what is the minimum cable height above the pavement?

2 inches


What is the minimum pavement temperature that will burn most dogs paws?

90


What is the Rule of 92?

if the sum of your binder performance grade for the max pavement design temperature and minimum pavement temperature is greater than 92. Modification of your binder is required in order for your binder to have adequate performance


Minimum width of road in Malaysia?

Malaysia minimum lane width is 2.75 meter according to JKR U2 and this width only applicable for local streets lane they have pavement roads.


The ability of a material to span horizontal distances with a minimum of support is called?

Tensile Strength -In architecture, the ability of a material to span horizontal distances with a minimum of support from underneath.


What is the minimum width of highway pavement in national highway?

It depends on: Traffic volume, design speed, Running speed, capacity of lane, and percentage of truckd


If you dont have enough material to make your minimum pagecount what should you do?

start asking questions


What are the three minimum pieces of information required to create a purchase requisition?

Material, Sold-to party, Valid-to date


If you don't have enough material to make your minimum page-count what should you do?

Start asking questions


What is the minimum amount of teeth on an axle blade which comes into contact with a material before cutting it?

12


If you have 16 SLocs in your unit and the cyclic inventory has a material which you have issued to 8 different SHRs that particular material will appear on a minimum of inventory count shee?

s


What does J-55 grade of tubing mean?

The 'J' has to do with the heat treatment of the material, and the 55 is the minimum yield strength (MYS) of the material is ksi (or thousand psi)