answersLogoWhite

0


Best Answer

cus if you draw drawings then you draw draweings alot more often

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why hatchings and symbols are used in construction drawings?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What types of drawings are used in construction?

Tom the cat


What does working drawings and detail drawings mean?

Working drawings are usually drafts used in construction or design. Detail drawings are drafts done that highlight or enlarge a smaller part of a component.


Which is used for chemical symbols today numbers drawings letters icons?

there are lots of chemical symbols about 110 but they are only used for elements not compounds.


What are the 3 types of paper used for construction drawings?

lined,toilet and plan


How did the Aztecs write?

They used symbols and drawings to write. This king of writing is called Codex


Why is hatching used in construction industry drawings?

If I understand your question, hatching is a drawing technique in which the hatching lines are used to delineate and highlight the "cut" "faces" of a cross section of a construction component. j3h.


How are orthographic drawing used by engineers?

It is excessively used in engineering and technical drawings.


What does the resistance symbol look like'?

Graphics can't be shown on Answer.com. Two symbols can be used: one is a zigzag and the other is an narrow oblong box. Search the internet for drawings of schematic symbols.


What were the stories told through the drawings of symbols called?

The stories told through drawings of symbols are called petroglyphs or pictographs. These ancient forms of communication were used by indigenous peoples and early civilizations to convey narratives, record historical events, or communicate spiritual beliefs. The symbols are typically found on rock surfaces, caves, or other natural materials.


What is tender drawing in construction?

Drawings that are used for estimating/pricing the cost of the building to be constructed.


What is red drawing?

A red-line drawings is essentially an intermediate drawing that shows corrections or changes to a previous drawing. The term red line literally comes from the (typically) red pen used to amend the drawings by hand. These changes mark-ups show changes made to the drawing subject matter during the manufactuer or construction of the product. For example, piping drawings were developed at the onset of a project to build a new school. During the course of construction for that school, the piping contractors changes several elements of the design (pipe size, routing, orientation etc). At the end of the project, the constructor would "red line" the drawings showing those changes. Red-lines are used to then develop record drawings. Record drawings, also called "as-builts" accurately reflect what was constructed and are used for future work and/or reference.


What are the three primary sets of drawings when work starts on site?

When work starts on a construction site, three primary sets of drawings are typically used to guide the construction process. These drawings provide essential information to the construction team and ensure that the project is executed according to the intended design. The three primary sets of drawings are: Architectural Drawings: These drawings depict the overall design and layout of the building or structure. They include floor plans, elevations, sections, and details that illustrate the dimensions, spatial relationships, and architectural features. Architectural drawings communicate the aesthetic vision, functional requirements, and construction methods for the project. Structural Drawings: Structural drawings are created by structural engineers and detail the load-bearing elements and systems of the building. They include information about columns, beams, slabs, foundations, and other structural components. These drawings specify the sizes, locations, and connections of the structural elements, ensuring the stability, safety, and integrity of the building. MEP Drawings: MEP stands for Mechanical, Electrical, and Plumbing. MEP drawings illustrate the installation and layout of the building's mechanical, electrical, and plumbing systems. They include information about HVAC (heating, ventilation, and air conditioning), electrical power distribution, lighting, fire protection, plumbing, and other utility systems. MEP drawings ensure that the building's mechanical and electrical systems are integrated properly and meet the project's functional requirements. These three sets of drawings form the foundation for the construction process. They provide detailed information about the building's design, structural elements, and systems, allowing contractors, subcontractors, and other professionals to understand and execute the project effectively and accurately.