4 workers would need 40 hours to paint 200 trucks, so 20 workers would paint your 200 in 8 hours.
it will take them 2 hours and a half to work together on the driveways. but it depends on how far the driveways are from each other
18/7 hrs.
Distance = Rate * Time Conversion needed, so I will convert 5 seconds into hours. 5 s (1 hour/3600 s) = 0.001389 hours ---------------------------so, Distance = 70 mph * 0.001389 hours = 0.09723 miles ------------------------------lets put that into something meaningful, like feet 0.09723 miles (5280 ft/1 mi) = 513 feet -------------------------------is how far the car traveled in 5 seconds at 70 mph
Well, if you want to split 5 hours evenly between 3 people, each person would get about 1 hour and 40 minutes. Simple math, my friend. Just set a timer and make sure no one hogs the time like it's the last piece of pie at a family gathering. Enjoy your fair share of the clock!
3 hours
people that owned large plantations or needed hard work done needed workers with a cheap salary that could work for long hours and that were not educated.
To determine how many workers are needed to build the cabin in 32 hours, we can use the formula: (workers) x (time) = constant. In this case, the constant is the same amount of work needed to build the cabin. So, 8 workers x 60 hours = 480 worker-hours. To build the cabin in 32 hours, we divide the constant (480 worker-hours) by the new time (32 hours) to find that 15 workers are needed to build the cabin in 32 hours.
The duration of Trucks - film - is 1.58 hours.
After being beat with sticks for hours at a time, they get ran over by semi-trucks in groups of five. After being beat with sticks for hours at a time, they get ran over by semi-trucks in groups of five.
Full time equivalence (FTE) is a number that represents the hours that a specific employee is working compared to other workers. You will need to determine the amount of hours needed to classify someone as a full time employee and use it to compare workers. Rosters can be changed based on FTE calculations.
It takes labor to produce goods.
The duration of Fast Workers is 1.1 hours.
Workers of all classes increasingly worked shorter hours
in a day workers in sweatshops work for about 19 hours and in a week they work about 40-60 hours a week hope tht helped xx
10 hours
Eight hours.
The duration of Blood of the Railroad Workers is 2.05 hours.