β 10y ago3 cubic feet or about one-tenth of a cubic yard. Cement is generally quantified in yards or cubic yards. It takes 27 cubic feet (3x3x3) to make a cubic yard. Therefore 3 cubic feet is about .111 or about one-tenth of a cubic yard (3 divided by 27).
To solve this convert all measurement to a yard or square yard basis: 3 inches is 0.083333333333 yard and 1500 square feet = 1500/9 = 166.6666666666667 square yards Thus the amount of mulch you need is 166.6666666666667*0.083333333333= 13.88888888883333 cubic yards. so you need to purchase 14 cubic yards of mulch for the job.
For estimating, use 1.8 tons per yard. 1.6 is a little closer to reality but a little extra never hurts.
Is this a cubic yard? If so it would depend on how thick you wanted it. For instants if you wanted it four inches thick that would be 9 layers to thy yard times 9 sq. ft. per yard. That would give your 81 sq. ft. of coverage.
1 yard = 36 inches. Set up proportion: 6/3.25 = 36/X Cross multiply: 6X = 3.25(36) Solve for X: X = 3.25(36)/6 = 3.25(6) = 19.50 So one yard of ribbon costs $19.50
how much does a cubic yard of concrete cost in atlanta georgia
FOR WINTER MIX CONCRETE IN THE NYC AREA AS OF FEBRUARY 2012 THE COST FOR 3200 psi CONCRETE IS $114 PER CUBIC YARD
what is the cost per cubic yard of contrete in place with labor cost
$70 - $100 per cubic yard depending on supplier.
55372
thatβs hard
64151
27 cubic feet in one yard of concrete. $90.00 divided by 27cu.yds= $3.33/cu.ft.
$110 per cubic yard material only
As of May 25, 2014, the cost of concrete in Washington State is from $100 to $110 per cubic yard. Prices vary depending on the grade of concrete you buy and other factors.
$100
Approximantely $115.00 per yard delivered