Want this question answered?
Be notified when an answer is posted
10x12 room
Assuming you use the standard 4" depth, you will need at least 1.75 cubic yards.
400
12 ft x 10 ft x .333 ft (4 in) = 39.96 cu ft. You need enough concrete for 40 cubic ft.
1.25 cubic yards for a 4-inch slab. 2 cubic yards (1.85) for a 6-inch slab.
110 sq ft
10 ft x 11 ft = 110 ft2 110 ft2 = 10,21933 m2
Approximately 126.39 square feet.
121 sq ft
1 sq foot = 0.0929 sq meter Answer = 10 ft x 11 ft = 110 sq ft = 110 x 0.0929 sq meter = 10.219 sq meters
Yes, generally 1 Ton ACs are goodup to120-140 Sq Ft.
6.096 meters
3465ft.
12 in = 1 ft → 11ft 8in x 11ft 3 in = 118/12 ft x 113/12 ft = 112/3 ft x 111/4 ft = 35/3 ft x 45/4 ft = 525/4 sq ft = 1311/4 sq ft = 131.25 sq ft
11ft by 10ft would be 110sq ft. take any tape measure and lay out some masking tape or something to better get an idea.
its 10000 ft² its 10000 ft²
1in = 2.54cm (exactly) 11ft 10in = 11 x 12 + 10 in = 142in ⇒ 11ft 10in = 142 x 2.54cm = 360.68cm ~= 3.6m