I do not deal in metric tonnes, but maybe the following will help. We use 25 short tons (2000 lbs per ton) is equal to 19 cubic yards.
26,000,000 cubic yards = 0.004769 cubic mile (rounded)
3.78 what? Cubic inches, yards, ounces, feet, pounds, gallons?????
54 cubic feet is equal to 2.07 cubic yards.
52 cubic yards = 1,404 cubic feet.
One gallon of water is equal to 0.004951 cubic yards.
345 cubic yards equal: 69,680 gallons of water.
You have 15.2911 cubic meters. 1 cubic yard is equal to 0.764555 cubic meter.
Easy to do. Multiply cubic yards by 27 to get cubic feet.
One cubic yard is equal to 363 = 46656 cubic inches. Therefore, 625 cubic yards is equal to 625 x 46656 = 29160000 cubic inches.
Assuming solid limestone, not pulverized: Solid limestone weighs approximately 163 lbs per cubic foot. If we divide 2000 by 163, we come up with 12.27 cubic feet. a cubic yard is 27 cubic feet, so a ton of limestone (12.27 cubic feet) would be about .45 cubic yards.
To convert cubic feet to cubic yards, you can divide the number of cubic feet by 27, as there are 27 cubic feet in a cubic yard. So, if you have 81 cubic feet, it would be equal to 3 cubic yards (81 / 27 = 3).
A yard is 91.44 cm One cubic yard is 91.44x91.44x91.44=764554.857984 cubic cm, or .765 cubic meters. Concrete and sand are often measured in cubic yards. In metric countries it is measured in cubic meters. Roughly there are 1.3 cubic yards in a cubic meter.