A 50 kg cement bag will hold about 1.3 cubic feet of dry cement powder.
Depends how big the bag is
1
4.50/bag cement, required for 1 cubic metre of concrete ( M10).
It would depend on how big the bag of cement is. 1 foot bags will be more in the cubic meter than 2 feet.
26 bags (40kgs cement bag)
To calculate the number of bags of cement required for 1 cubic meter of M15 grade concrete, first determine the mix ratio, which is typically 1:2:4 (Cement:Sand:Aggregate). For M15 concrete, approximately 1 part cement is needed for every 7.5 parts of total volume (1 + 2 + 4 = 7). Given that one bag of cement weighs 50 kg and has a volume of about 0.035 cubic meters, you would need around 7.5 bags of cement for 1 cubic meter of M15 concrete.
one bag
To calculate the cement ratio for 1 cubic meter (cumic) of concrete, you first need to determine the mix ratio (e.g., 1:2:4 for cement, sand, and aggregate). The total parts of the mix are summed, and the volume of cement is calculated based on the proportion of the mix. For example, in a 1:2:4 mix, the total parts are 1 + 2 + 4 = 7. The volume of cement needed is then (1/7) × 1 cubic meter, which equals approximately 0.143 cubic meters. Given that one bag of cement typically weighs 50 kg and occupies about 0.035 cubic meters, you would divide the volume of cement by the volume per bag to find the number of bags: 0.143 / 0.035 ≈ 4.1 bags.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
volume of 1 cement bag is 0.035cu.m.
How many cubic meters in 1 cement bag of 50kgs
For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.