25 cubic yards is 675 cubic feet.
65 x 45 x 25 divided by 27 cubic feet in a cubic yard = 2,708 cubic yards
I'm assuming you mean cubic yards. There are 27 cubic feet in each cubic yard 27cf x 152cy = 1,404 Cubic feet
25 sq ft * 5 inch = 25/9 sq yards * 5/36 yards = (25/9)*(5/36) cubic yards = 125/216 cubic yards
To convert the dimensions to yards, we first convert inches to yards by dividing by 36 (since 1 yard = 36 inches). Then we multiply the dimensions to get the volume in cubic yards. 25 feet = 25 feet 13 feet = 13 feet 4 inches = 4/36 yards = 1/9 yards Volume = 25 * 13 * 1/9 = 36.111 cubic yards (rounded to 3 decimal places).
A 32-gallon garbage can is equivalent to approximately 0.33 cubic yards of mulch.
To calculate the amount of concrete needed for a space measuring 10 feet by 25 feet by 4 feet, multiply the dimensions together: 10 ft x 25 ft x 4 ft = 1,000 cubic feet. Since concrete is typically measured in cubic yards, convert cubic feet to cubic yards by dividing by 27 (there are 27 cubic feet in a cubic yard). Thus, 1,000 cubic feet is approximately 37.04 cubic yards of concrete needed.
3000 cubic yards or 81000 cubic feet. (27 ft3 per cubic yard) 40 x 25 x 3 = 3000
25 feet is 8.33 yards.
Almost right. 245 x .25 = 61.25 cubic feet. But there are 27 cubic feet in a cubic yard (3ft x 3ft x 3ft = 27cu. ft.) whcih would mean 2.3 cubic yards of concrete.
3 inches = .25 feet400 square feet X .25 feet = 100 cubic feet100 cubic feet / 27 cubic feet per cubic yard = 3.7 yards
18 cubic yards or 487.5 cubic feet.
Assuming you need a slab 25 feet x 32 feet x 4" you would need 10 yards of concrete. 25 x 32 x .33 / 27 = 9.7 cubic yards