1 cubic yard of concrete fills 27/depth in feet square feet.
81 Square feet.
To determine how many cubic feet of concrete are needed, you first need to know the depth of the concrete slab. For example, if the slab is 6 inches thick, you would multiply 360 square feet by the thickness in feet (6 inches = 0.5 feet) to get 180 cubic feet of concrete required.
you can not answer that as area and length are different
They do not directly convert. Cubic feet is a measure of volume while square feet is a measure of area.
A cubic yard is 46,656 cubic inches. Spread to a thicknes of 5 inches, a cubic yard of concrete covers 9332.1 square inches, which is 64.8 square feet.
1 cubic yard of concrete fills 27/depth in feet square feet.
ONE I THINK, SINCE THERE ARE 27 CUBIC FEET IN A CUBIC YARD OF CONCRETE (WHICH MEASURES 3 FEET BY 3 FEET BY 3 FEET).
81
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
It depends upon how thick you want the concrete. For example, if you want the concrete to be 6 inches thick, then you will need 200 cubic feet. There are 27 cubic feet per cubic yard; so divide the 200 cubic feet by 27 to get 7.4 cubic yards.
it equals nine square feet * * * * * Nine square feet is 1 square yard, NOT 1 yard. In any case, "a yard" of concrete is used by builders' merchant to mean a CUBIC yard of concrete.