twelve
Oh, dude, you're asking about wheelbarrows and cubic meters? That's like asking how many puppies fit in a swimming pool! Okay, technically speaking, it depends on the size of the wheelbarrow, but on average, you'd need about 25-30 regular-sized wheelbarrows to fill up a cubic meter. But seriously, who measures things in wheelbarrows these days?
( 1 ) divided by (the capacity, in cubic meters, of the wheelbarrow you're using)
Assuming a typical wheelbarrow holds around 0.05 cubic meters, you would need around 2,000 wheelbarrows to move 100 cubic meters of material.
if it is solid stone, I don't think there will be any wheel barrows in there, unless you carve one out
According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete According to concrete taxi: http://www.concretetaxi.com/faq.asp#77 ~15 wheelbarrow loads in a single cubic meter of concrete
It depends of course a bit on the size of the wheelbarrow and on how high you want to pile up the sand. But a typical wheelbarrow might hold about 85 liters of sand. 1 cubic meter equals 1,000 liters. So you would need about 12 wheelbarrow loads to get 1 cubic meter.
35.315
Given a 6 cubic foot wheelbarrow, and that there are 27 cubic feet in a cubic yard, you would need 4.5 wheelbarrows to make a cubic yard. The wheelbarrow may have the capacity stamped on it. David
1,000
It depends of course a bit on the size of the wheelbarrow and on how high you want to pile up the sand. But a typical wheelbarrow might hold about 85 liters of sand. 1 cubic meter equals 1,000 liters. So you would need about 12 wheelbarrow loads to get 1 cubic meter.
1 cubic meter is 1.308 cubic yards.