answersLogoWhite

0

1.68 cubic meters

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

How much oxygen is in the expired air in 8 cubic meters?

The concentration of oxygen in exhaled air is approximately 16% to 18%. In 8 cubic meters of exhaled air, this would translate to about 1.3 to 1.44 cubic meters of oxygen.


How many cubic meters of oxygen is there in 8 cubic meters?

I make it 8 cubic metres.Additional answerYes, you're right. I checked on my calculator.


How much is 8 kl?

8 kiloliters (kl) is equivalent to 8,000 liters. In terms of cubic meters, it is equal to 8 cubic meters since 1 kiloliter is equal to 1 cubic meter. This volume measurement is often used for liquids.


How many cubic meters are in 17mm3?

17 cubic millimeters = 1.7 × 10-8 cubic meters


A cube has a volume of 8 cubic meters If each side is doubled in length what will its new volume be in cubic meters?

23 = 8 cubic metres 43 = 64 cubic metres


What is the volume of a cube that measures 2 meters one side?

The volume of a cube that measures 2 meters on one side is: 8 cubic meters.


What is the volume of a cube with the side of 8 meters?

A cube with a side length of 8 meters has a volume of 512 cubic meters.


How many inches of 8 cubic meter?

1 cubic meter = 61,023.74 cubic inches. so multiply 8 by both sides 1 cubic meter * 8 = 61,023.74 * 8 8 cubic meters = 488, 189.92 cubic inches


How much concrete is needed to pour a slab 6 meters by 8 meters by 10 cm?

10 cm = 0.1 meterThe volume of the slab is (6 x 8 x 0.1) = 4.8 cubic meters


How many imperial gallons are in 8 cubic meters of water?

Eight cubic meters of water equates to 1,759.75 Imperial gallons.


How many cubic meters in a area of 2meters by 2 meters by 2 meters?

8 cu m


How much concrete mix use in 5 cubic meter 1 bucket cement 4 bucket sand 8 bucket 40mm metal?

To calculate the total concrete mix for 5 cubic meters with the specified ratio of 1 bucket of cement, 4 buckets of sand, and 8 buckets of 40mm metal, first determine the total parts: 1 + 4 + 8 = 13 parts. For 5 cubic meters, each part would be approximately 0.385 cubic meters (5 / 13). Therefore, you would need about 0.385 cubic meters of cement, 1.54 cubic meters of sand, and 3.08 cubic meters of 40mm metal. Adjust bucket sizes accordingly to match these volumes based on the bucket's capacity.