According to the wording ,2 different phase wires "can" run through the same conduit. Not only can they, but if they are part of the same circuit they must. And in cases where conductors are paralleled, meaning more than one conductor per phase as is common in commercial and industrial installations, you put one conductor of each phase and a neutral, if one exists, and a ground in each conduit. Not doing so, meaning to put all of one phase in one conduit, causes a voltage to be induced into the conduit and a tremendous amount of heat builds up. Even when using pvc or other non-metallic conduit, somewhere along the way you have something metallic and have the same problem. To simplify, you must put all conductors associated with the same circuit in the same conduit.
well based on the ending of conduit 2 i think the 3rd one Will be released soon
Conduit Installation: 9 Steps Step 1: Mark Conduit Placement: Using a measuring tape, mark the locations where the conduit will be installed, including entry and exit points, bends, junction boxes, and supports. Step 2: Cut and Prepare Conduit: Measure the required length for each conduit section based on your markings. Use a conduit cutter or hacksaw to make clean, straight cuts on the conduit. Step 3: Install Conduit Fittings: Attach the appropriate conduit fittings, such as elbows, couplings, or connectors, to the conduit sections. Step 4: Mount Conduit Supports: Install conduit straps or clamps at regular intervals along the conduit route. Step 5: Assemble the Conduit System: Connect the conduit sections and fittings together, ensuring a snug fit. Apply PVC conduit cement or glue to the inside of the fittings before joining them to ensure a watertight seal. Step 6: Pull Wires: Attach a fish tape or draw wire to the starting point of the conduit system. Carefully feed the fish tape through the conduit, pulling it along the desired path. Use lubrication, if necessary, to ease the wire pulling process. Step 7: Install Conduit Accessories: Install conduit bodies, junction boxes, or other accessories as needed for wire splices, changes in direction, or access points. Step 8: Verify and Secure Connections: Double-check all connections, ensuring they are properly aligned, secure, and free from any gaps or looseness. Step 9: Conduct Final Inspection: Inspect the entire conduit system to ensure it is properly aligned, securely mounted, and meets safety standards. Check for any visible defects, such as misalignments or damaged conduit. That's it.
Conduit is just a medium to get the wires from one place to another. There is no voltage restrictions in low voltage wiring (750 volts or less). When it comes to conduit fill, electricians are governed by the electrical code conduit fill tables. The conduit is sized to accommodate the conductor size for a specific load.
ONE
Someone looking to purchase PVC conduit fittings can find them at most any local hardware store such as Lowes or Home Depot. Other places that may have this item are eBay, Amazon, Menards, and Hardware World.
To join sealtite and PVC conduit, you can use a threaded adapter to connect the two types of conduit. Make sure to use the appropriate size adapters and follow the manufacturer's instructions for a secure and watertight connection. It's important to ensure that the joined conduit maintains the integrity of the overall electrical system.
That's an easy one, using conduit is always a better option, and in most European countries is a requirement. Here in the UK, inferior installation standards look more towards cost than quality. My recommendation.....conduit, all the way, all the time.
According to the wording ,2 different phase wires "can" run through the same conduit. Not only can they, but if they are part of the same circuit they must. And in cases where conductors are paralleled, meaning more than one conductor per phase as is common in commercial and industrial installations, you put one conductor of each phase and a neutral, if one exists, and a ground in each conduit. Not doing so, meaning to put all of one phase in one conduit, causes a voltage to be induced into the conduit and a tremendous amount of heat builds up. Even when using pvc or other non-metallic conduit, somewhere along the way you have something metallic and have the same problem. To simplify, you must put all conductors associated with the same circuit in the same conduit.
One can find information about conduit fittings from various sources. Some of those sources are Grainger, Home Depot, Prime Conduit, Steel Conduit and Lowes.
In the first part of the question there will be only one wire in the conduit, in the second part of the question there will be two wires in the conduit.
If one is looking to find employment as an EMT there are a wide range of job sites that have listings for EMT positions. One can find these jobs on sites such as Indeed, CareerBuilder and Monster.
One could purchase aluminum conduit at home improvement retailers such as Home Depot, Lowe's or Rona. One could also order it through a wholesaler such as American Conduit.
There are a few factors when wiring a workshop. The type of work shop and what is manufactured in it. Whether any types of chemicals or gasses will be present. Overall voltage and amperage that is to be used in the workshop. Whether there are any motor loads that are associated with the workshop.These types of projects usually use a conduit system. The conduit system can be of three types. They can be PVC, EMT or Rigid conduit.In Canada, Teck cable is used in these types of buildings installations. Using this type of a system keeps the labour costs lower than conduit systems.If you want to explain the workshop in full detail by using the Discuss button on the left, a more detailed answer will be given.
The type of conduit system is governed by two factors. One the code book states what type of system can be places in what specific locations. The second factor is what the electrical engineer specifies that what he wants the conduit system to be on his project. EMT is used in the majority of jobs for industrial and commercial projects. As a conduit system it is easy to install and more circuits can be added to the system very easily abiding by the code book rules for conduit fill.
Adding an extra length of shaft on the existing shaft to take extra pulleys will put an extra load on the bearings supporting the shaft. In the long term this would shorten the life of the bearings. The makers might be able to supply more information like the side-load specification for the bearings. If in doubt support the outer end of the shaft.
To obtain an EMT certification, one must take an EMT course. This course is usually offered at colleges and vo-tech schools in your area.