maximum spacing assording to IS 456 = 300mm
18
A civil engineer will determine the size, spacing, oreintation, strength requirements, and coatings on the reinforcement. These are based upon the calculations of various loads and moments on the structure you are reinforcing and then applying a factor of safety.
The maximum span of a waffle floor slab typically ranges from 20 to 30 feet (6 to 9 meters), depending on various factors such as the slab thickness, the spacing of the supporting beams, and the load requirements. For larger spans, additional reinforcement and design considerations may be necessary. It's essential to consult with structural engineers to ensure safety and compliance with building codes.
2" based strictly on the slab thickness. However, it may be governed by form spacing, rebar spacing or rebar clearance to the forms.
Welded-wire fabric (WWF) reinforcement sizes vary based on the spacing and diameter of the wires used. Common sizes include the number of wires per foot (e.g., 6x6, 4x4), where the first number indicates the spacing in inches between the wires in one direction and the second number indicates the spacing in the perpendicular direction. Wire diameters typically range from 10 to 6 gauge, with thicker wires providing greater strength. The specific size required depends on the structural application and local building codes.
*
30ft
18
4"
Plant spacing provides greater opportunity to plant leaves to receive maximum sun shine for photosynthesis.
A civil engineer will determine the size, spacing, oreintation, strength requirements, and coatings on the reinforcement. These are based upon the calculations of various loads and moments on the structure you are reinforcing and then applying a factor of safety.
You can easily give inline spacing in HTML5. it could be done by placing  
Maximum 30kg chicken /m2. For all sorts of maximum/minimum standards associated with aspects of keeping poultry try this publication: These are the rules developed in Australia and New Zealand by a combined government committee.
The joist spacing required for composite decking will depend on: * the strength of the particular composite decking material chosen * the dimesions of the composite decking material
2" based strictly on the slab thickness. However, it may be governed by form spacing, rebar spacing or rebar clearance to the forms.
The recommended specifications for a 2x6 rafter in a residential construction project typically include a minimum grade of 2 lumber, a maximum span of 10 feet, and a maximum spacing of 24 inches on center. It is important to consult with a structural engineer or local building codes to ensure compliance with specific requirements for your project.
There must be an outlet a maximum of every 12 feet. Any wall over 2 ft long except behind a door must have an outlet.