answersLogoWhite

0

use a known volume container to measure a quantity = 200 x (the depth you want the sand).

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

Find the surface area of a baseball with a circumference of 22.608 centimeters to determine how much leather is needed to cover the ball use 3.14 pi?

sfdl;kl;jksdl;jkdsfjksdfasdjka


How much sheetrock do I need for my project?

To determine how much sheetrock you need for your project, measure the area of the walls and ceilings you plan to cover with sheetrock. Calculate the square footage of the space and then purchase enough sheetrock to cover that area, accounting for any waste or extra pieces needed for cuts and mistakes.


How much cement will you need to cover 180 square feet?

How much cement is needed to cover 192 square feet of area


How much fill dirt is needed to cover 250 square feet?

The answer will depend on the depth to which the area is covered.


How much stone do I need for landscaping?

The amount of stone needed for landscaping depends on the size of the area you want to cover and the depth of the stone layer. To calculate the amount of stone needed, measure the length and width of the area and multiply them to get the square footage. Then, determine the desired depth of the stone layer in inches and convert it to feet. Finally, use an online calculator or consult with a landscaping professional to determine the amount of stone needed in cubic yards.


How much stain is needed for the fence?

To determine how much stain is needed for the fence, calculate the surface area of the fence and then use the stain coverage rate provided on the stain product. Multiply the surface area by the coverage rate to find the amount of stain needed.


How much mortar do I need for my upcoming project?

To determine how much mortar you need for your project, calculate the area to be covered and the thickness of the mortar layer. Multiply the area by the thickness to find the volume of mortar needed.


How much water is needed to cover an area of 1 square foot with 1 2 inch of water?

To cover an area of 1 square foot with 1/2 inch of water, you would need 0.623 gallons of water.


How much dirt is needed to cover a 10 foot by 150 foot area 12 inches deep?

You will need 1500 cubic feet.


How do you calculate how much carpeting is needed for a room?

The obvious answer is to figure out the total area of the room and then buy an area of carpet equal to this amount. Since rooms often do not match up with standard carpet widths, this can lead to a patchwork of small bits cobbled together to cover the last areas of the room. Choose an area of the room that can be covered with one piece of the carpet. This is carpet area #1. Then determine the fewest large pieces of carpet needed to cover the rest -- even if there is some waste involved. This is carpet area #2. Total carpet purchase is area 1+2.


How much lumber do I need for my upcoming project?

To determine how much lumber you need for your project, calculate the total square footage of the area you plan to cover with lumber. Then, divide that number by the square footage of each piece of lumber you plan to use. This will give you the total number of pieces of lumber needed for your project.


How much acrylic paint is needed to cover a canvas according to a chart?

The amount of acrylic paint needed to cover a canvas depends on the size of the canvas and the thickness of the paint layers. You can refer to a paint coverage chart to determine the approximate amount of paint required for your specific canvas size.