1 mason and 1 helper will finish about 40 to 50 sq.m. per day (8 hours) depending on the area.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How many days will take to finish 1000 square meters of plastering for one mason?

The time it takes for one mason to finish plastering 1,000 square meters can vary based on factors such as the mason's skill level, the type of plaster being used, and the working conditions. On average, a skilled mason can plaster around 10 to 15 square meters per day. Therefore, it would take approximately 67 to 100 days to complete the task. However, this estimate can vary widely based on the specific circumstances.


How many square meters of acc block can one mason do per day?

A mason may be able to do acc block but acc block cannot do mason.


How many square meters of CHB laying can do one mason per day?

50 sqm


How many square meter does a 50 kg bag of cement cover for plastering?

Well, isn't that a happy little question! A 50 kg bag of cement can cover approximately 12-15 square meters for plastering, depending on the thickness of the plaster. Just remember, there are no mistakes, only happy accidents in the world of DIY projects. Just trust your instincts and enjoy the process!


How many square meters can a mason and a helper plaster on wall?

The number of square meters that a mason and a helper can plaster on a wall depends on various factors such as the size of the wall, the type of plaster being used, the skill level of the workers, and the tools being utilized. On average, a skilled mason can plaster around 20-30 square meters per day, while a helper may assist in preparing materials and supporting the mason, potentially increasing the overall productivity. It is important to consider the specific circumstances of the job to estimate the exact square meterage that can be completed in a given time frame.


How many square meters of tile can do one mason pir day?

The amount of tile a mason can install in a day varies based on factors such as the type of tile, the complexity of the layout, and the mason's experience. On average, a skilled mason can install between 20 to 50 square meters of tile per day. However, for intricate designs or larger formats, this number may be lower. It's essential to consider these variables when estimating productivity.


How many bags of cement and sand for 270 square meters of plastering?

To calculate the amount of cement and sand needed for plastering 270 square meters, you can use a typical mix ratio, such as 1 part cement to 4 parts sand. Assuming a plaster thickness of about 12 mm, you would need approximately 1.5 cubic meters of plaster. This translates to roughly 300 kg of cement (about 6 bags of 50 kg each) and about 1.2 cubic meters of sand. Always consult a local expert for precise calculations based on specific conditions and mix ratios.


12 square meters x 12 square meters equals how many square meters?

144 square meters


How many 210 square feet is how many square meters?

Approximately 19.51 square meters.


How many squares is 121 square meters?

11 meters square are 121 square meters.


350 square feet equals how many square meters?

About 32.5 square meters. (32.516064 square meters)


How many 885 square feet is how many square meters?

885 square feet is 82.2191904 square meters.