A point to the left of a budget line is commonly a tradeoff. But a point to the right is an opportunity cost.
Finding the midpoint of a segment Drawing a perpendicular line segment from a given point to a given segment Drawing a perpendicular line segment through a given point on a given segment Drawing a line through a given point parallel to a given line
paint it
A line on a drawing pointing to another line or part to which the dimensions relate.----
in engineering drawing, a line with an arrow at each end is called a dimension line
the prices of both products and money income are assumed to be constant.
The Production Budget for On the Line was $10,000,000.
Drawing the Line was created on 1915-08-23.
Slant line is a line which is not horizontal or vertical. In drawing they help to form proportional objects.
A "blind spot" is an expense a person overlooked or did not account for when drawing up a budget.
Contour-line drawing refers to drawing the outline of something,usually a human figure. Matisse has many examples of this.
drawing by children for compition
The Production Budget for Walk the Line was $29,000,000.
The Production Budget for In Her Line of Fire was $1,000,000.
A budget line is a locus of combination of two goods a consumer can afford to buy with his/her income.shift in a budget line can be caused by various factors like a change in individuals income
Drawing the Line - 2014 was released on: USA: 2014
Jonah's One-line Drawing was created in 1998.