Cards in this guide (7)
160j of work was needed in order to move an object 8m across a floor what was the force in N that was needed to do this job
160j of work was needed in order to move an object 8m acroos a
floor what was the force in N that was needed to do this job? i
think it may be not sure but 20N dont agree with me just maybe your
imput will be different
If a graph shows time on the horizontal axis and speed on the vertical axis a straight horizontal line across the graph would indicate
You set up a pulley to help you lift something you anchor the rope at one end and arrange a moveable pulley to achieve a mechanical advantage of 2 by the time you have lifted the object 5m off the gro
you set up a pulley to help you lift something you anchor the
rope at one end and arrange a moveable pulley to achieve a
mechanical advantage of 2 by the time you have lifted the object 5m
off the ground how much rope have you pulled through the pulley
answer is (10m)
Rate of deceleration are always expressed as
Rates of deceleration are always expressed as negative numbers.
With regard to the object-lifting examples traced in lesson3 the ima is equal to the distance divided by the distance
Near the end of page 124 of your reading material you are shown a calculation to determine a car's final speed after accelerating for four seconds
There is a formula to calculate the speed of a car after
accelerating for four seconds. This formula is v = u + at, where v
= velocity, u = initial velocity, a = acceleration, and t = the
time it takes to accelerate.
What is the effect of using an inclined plane to lift an object