answersLogoWhite

0


Best Answer

BETTER TO BAND IT TO AVOID SPLINTERING AT ENDS DUE TO HITTING GROUND WHILE STORING AND SHIFTING.

User Avatar

Wiki User

17y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: If a scaffold board is cut does it have to be banded?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the purpose of toe bar on scaffold?

The toe bar on a scaffold helps prevent materials and tools from falling off the platform and creating hazards for workers below. It also provides additional support and stability to the scaffold structure.


What is a wooden or metal structure that construction workers stand on?

Scaffold


Are silly bands being recalled?

I believe not because they cut off your circulation and there banded from schools.


Why was Louis XVI unable to finish his speech on the scaffold before his execution?

His last words were cut short by a drum roll.


What is the antonym of scaffold?

scaffold is a noun so there is no antonym.


What are the 3 types of scaffolding?

1.Cantilever scaffold 2.Suspended scaffold 3.Single pole scaffold


When was The Linear Scaffold created?

The Linear Scaffold was created in 1997.


What does counter lever scaffold mean?

A cantilever scaffold, also known as a counter lever scaffold, is a type of scaffold that is supported at one end only. It extends horizontally from a building or structure, providing access for workers to perform tasks at a height. This type of scaffold is often used in situations where it is not possible to support the scaffold from the ground.


How do you cut a pyramid out of poster board?

How to make a pyramid out of poster board?


Who is allowed to sign a scaffold tag?

Someone trained in scaffold inspection.


What is the relation between geometry and carpentry?

Being competent in math is very helpful when working as a carpenter. If you know the proper math formulas you can often build things with less information and therefore quicker. Say I am on the ground and you are in the air nailing cut to fit pieces of plywood on a gable end of a roof. If I know how to figure the rise of the roof over the span of the pieces of plywood I will never have to ask you to measure the height where the new board meets the last installed board then ask you to measure over 4 feet and level up that line and measure the height of the cut at that point....I will have already cut the board and you dont have to stand there on a scaffold staring at my ass while i cut the board because by the time you install one I already figured and cut the next. Being able to do things right the first time counts alot in construction and if you can do that then your boss wont have any problem justifying that raise you just asked him for.


How long did Hester Prynne stand on the scaffold?

Hester Prynne stood on the scaffold for about three hours.