If your pour to a standard 4-inch depth, you will need 3.54 Cubic Yards.
Chat with our AI personalities
1350/depth of the concrete in feet
22.22 square yards.
As long as you mean square yards, then: 1 square yard = 9 square feet 4077 square feet / 9 square feet per square yard = 453 square yards
200 square feet
28.88889 sq. yards.