3 hours
Machine # 1 works at a rate of 1/2 truckload per hour, while machine 2 works at a rate of 1/4 truckload per hour. The two machines together work at a rate of 3/4 truckload per hour complete the job 1/(3/4) = 1-1/3 hours.
24 hours
20 hours.
Eight hours.
10.8 hours is 648 minutes.
3
Machine # 1 works at a rate of 1/2 truckload per hour, while machine 2 works at a rate of 1/4 truckload per hour. The two machines together work at a rate of 3/4 truckload per hour complete the job 1/(3/4) = 1-1/3 hours.
Direct labor hours is the hours available of labor or people for example if a factory has 10 workers and in a week of 5 days of 8 hours then total direct labor hours available in week is (10*8*5) 400 hours while machine hours is how much a machine can work per day of 8 hours for example if machine need setup time of 2 hours per day then hours available per day is 6 and total hours per week will be 30.
The duration of Alone with Her is 1.3 hours.
The duration of For You Alone is 1.75 hours.
In construction it means " Machine Usage Ratio " . It is the ratio of no. of hours for which machine worked to no. of hours for which machine was available.
This is happening to you because you are mainly afraid of staying alone in a room , you are a complete wreck, for this having company would be a good idea.
The amount of credits alone does not determine the eligibility for a degree. You must declare a program of study (major), and complete all the course requirements particular to that specific program of study.
The duration of Home Alone is 1.7 hours.
The duration of Utterly Alone is 1.5 hours.
The duration of Ourselves Alone is 1.13 hours.
The duration of For Love Alone is 1.7 hours.