answersLogoWhite

0

What else can I help you with?

Related Questions

Siding Contractors?

form_title=Siding Contractors form_header=Dramatically change the look of your home with new siding. Get it installed with help from the siding pros! What kind of siding is currently on your exterior walls? =_ What are the measurements of the walls that need siding? =_ What type of siding would you like installed? =_ Do you need siding removed before the new siding is installed?= () Yes () No () Unsure


What are some asbestos regulations?

Many of the asbestos regulations in the UK concern the precautions that must be taken whenever it is found in a building and requires to be disturbed or removed. Any work carried out must be done by a licensed contractor. Anyone who is likely to be exposed to asbestos whilst at work must have mandatory training.


What is the process for lally column replacement in a building structure?

The process for lally column replacement in a building structure involves first identifying the column that needs to be replaced. Next, temporary support is put in place to hold up the structure while the old column is removed. A new lally column is then installed in the same location and adjusted to support the load of the structure. Finally, the temporary support is removed once the new column is securely in place. It is important to consult with a structural engineer or contractor to ensure the replacement is done correctly and safely.


What was the amount of earth removed while building the panama canal?

25%


What is Shuttering Store and Where These Shuttering Stores are located in ChandigarhPanchkula Mohali?

Shuttering Store is Place Where you can Get all the Shuttering and Scaffolding Material required for various types of Building Construction Projects.Shuttering Store Provide these Materials on Hire basis to Building Contractors, during Construction of Building a Contractor Needs M.S Plates, Channels, Props, Cuplocks, Jacks,Joint pins, to create a temperory structure to support the concrete till the time it is Solidified enough to take its own weight. After that this materials is removed and returned to Shuttering Store.In Chandigarh, Panchkula,Zirakpur, Mohali Shuttering Market is Located at Plot No. 15-16 Ind Plots, Daffarpur On Ramgarh to Derabassi Road (One KM from Ramgarh Fort). VCC Shuttering House Call Us: +91 9915980350, +91 9417057587.


Moving House Contract?

Moving House Contract(Download)_________________________, referred to as CONTRACTOR, and _________________________, referred to as OWNER, agree:OWNER owns a building, of approximately ____________________ square feet, located at ___________________________.OWNER desires that the building be moved from its present location, ___________________________, to __________________________. The placement of the building at ____________________________ shall be as follows:______________________________________________________________CONTRACTOR acknowledges an adequate opportunity to examine the building at its present location and to prepare routes for the moving of the building.CONTRACTOR shall obtain any and all permits required for the moving of the building. Further, CONTRACTOR shall secure public liability insurance with a minimum limit for property damage of $__________ (_________________________________________ & __/100 dollars).CONTRACTOR shall move the building on or before ________________________, and the same shall be delivered on or before ________________________, time being of the essence. In the event of unsuitable weather, the deadline shall be extended by the number of days of unsuitable weather.CONTRACTOR shall not be responsible for making utility disconnections or connections, or preparation of foundations except as is expressly provided for in writing.CONTRACTOR shall place the building upon the foundation at the new location and CONTRACTORs performance be completed upon placing the building properly on the foundation. No later than the date of the move specified above (________________________).OWNER shall have caused all utilities to be disconnected, and all chattels or personal property to be removed from the building.CONTRACTOR shall not be required to commence performance until such preparations are readied, and any dates specified herein shall be extended accordingly.CONTRACTOR shall use reasonable care to prevent damage to the building, and shall restore any damage caused by the move.CONTRACTOR shall secure hazard insurance for the building itself in a minimum amount of $__________ (_____ _________________________ ______ & __/100 dollars).CONTRACTOR shall provide proof of such insurance coverage to OWNER upon request.OWNER shall pay to CONTRACTOR the total contract price of $__________ (_____________________________________ & __/100 dollars) for the services to be rendered hereunder as follows:_____________________________________________________________Such sums due shall constitute a lien upon the building. Final payment shall be due no later than________________________, provided, that OWNER shall not be required to make final payment until CONTRACTOR provides an affidavit to OWNER that all materials and laborers have been paid in full.Dated: ________________________________________________________________For _________________________ Owner_____________________________________For ___________________________ ContractorMoving House ContractReview ListThis review list is provided to inform you about this document in question and assist you in its preparation. This agreement can be modified for most property moves.1. Make multiple copies. Give an original to each signer. The owner should be sure to have one kept in the real estate files where the moved property resides.


How do you go about getting misdemeanors removed?

go to the court building ask to file a pardon


How was the giant peach removed from the top of the empire state building?

cuz thats weird


How much of a load bearing wall can be safely removed without compromising the structural integrity of the building?

It is recommended to consult with a structural engineer to determine how much of a load-bearing wall can be safely removed without compromising the structural integrity of the building.


What event removed the political discontent in Washington of building the Pacific Railway in 1860?

The civil war.


Which type of drawing shows the building as if part of it were removed?

A section drawing shows a building as if part of it were removed, revealing the interior layout and structural details. This type of drawing is essential for understanding how different spaces interact within the building and helps convey information about materials and construction methods. Sections can be vertical or horizontal, depending on the perspective needed.


How does the owner of the building resemble Hercules in Antaeus by Borden Deal?

The owner of the building resembles Hercules because like Hercules, he removed t.j. From his source of strength, the nature.