Predetermined overhead rate is that overhead rate calculated before start of production to allocate overhead costs to units of products by using some ratio in relation to some other cost like material cost or labor cost or labor hours etc.

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Definition of a predetermined overhead rate?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

When is the Predetermined overhead rate usually calculated?

The predetermined overhead rate used to apply overhead to finished jobs is determined before the period begins.


How do you compute predetermined overhead rate as a percentage of direct labor costs and direct labor hours?

Predetermined overhead rate based on direct labor cost = Budgeted overhead cost / direct labor cost / 100 Predetermined overhead rate based on direct labor cost = budgeted overhead cost / direct labor hours.


What is the advantage of using a predetermined overhead application rate?

RUNOVER


Does the predetermined overhead rate change in proportion to the change in predicted production Overhead rate 100000 at .10 a unit. Outputs One group- 20000 units one at 300000 one at 400000?

Predetermined overhead rate is calculated according to the normal production capacity of the plant.


What is the predetermined cost?

Predetermined rate is overhead rate allocated to product cost to find out the full product cost and it is an estimated rate based on total expected overhead on normal capacity divided by some machine hours or direct labor hours etc.


How do I compute predetermined overhead rate as a percentage of direct labor costs?

Predetermined overhead rate = Est. total Manuf. Overhead Cost / Est. total amt of allocation base In this case, allocation base would be direct labor (as opposed to machine labor). Hope this helps


How do you calculate Overhead absorption rate apportionment?

Overhead rate : Overhead rate = total overhead cost / direct labor OR Overhead rate = Total overhead cost / machine hours.


Why do you need applied overhead rate?

We need applied overhead rate to know about the overhead variance. Otherwise how will we know how much overhead expenses should have been incurred and how much is actually incurred? Predetermined rate multiplied by the actual unit level activity is applied overhead


Why do companies use a predetermined overhead rate rather than actual overhead costs to apply overhead to jobs?

because they have no life, also they predetmined pigs


Why you charge production at pre determined factory overhead rate?

The predetermined factory overhead rate is the cost associated with all products produced by the company. This helps the company easily assign cost.


What are the Reasons for using applied overhead versus actual overhead?

Using a predetermined rate makes itpossible to estimate total job costs sooner. Actual overhead for the period is notknown until the end of the period.


What is absorption method of marginal costing?

Absorption method is that in which predetermined overhead rate is use to allocate all overheads to departments or activities.