If you mean 3/6 then it is 1/2 but if you mean 36 then it is 36/1
If you mean 2/3 of 36 then it is 24
36 days is not "late". 36 days is "absent".
If you mean 7/8 of 36 then it is 31.5
If you mean 1/3 of 36 then it is 12
Days of Our Lives - 1965 1-11106 was released on: USA: 18 June 2009 Belgium: 11 November 2013
Cool in Your Code - 2004 Long Island City Queens 11101 11106 4-3 was released on: USA: 18 April 2006
If you mean 3/6 then it is 1/2 but if you mean 36 then it is 36/1
36 i in y = 36 inches in a yard
36 Inches in a Yard
If you mean 18 and 36 then the LCM is 36
If you mean 2/3 of 36 then it is 24
36 days is not "late". 36 days is "absent".
If you mean 7/8 of 36 then it is 31.5
Geometric mean of 36 and 2 is 8.48528137423857 Look at link: "Calculation of the geometric mean of two numbers".
If you mean 4, 12 and 36 then the LCM is 36
If you mean 2/3 of 36 then it is 24