answersLogoWhite

0

The answer will depend on what information is available. Ideally, you know the length, breadth and height (in the same units of measurement) and simply multiply the three together.

User Avatar

Wiki User

12y ago

What else can I help you with?

Related Questions

How much does rcc slab weight per cubic meter?

2500N/m3


What is the Weight of 1 Cubic meter of granite at 2 CM thick?

The weight of 1 cubic meter of granite will depend on its specific density, but on average, it ranges from 2,600 to 2,700 kg/m3. For a slab of granite that is 2 cm thick, the weight can be calculated by multiplying the density by the volume (area x thickness). The thickness of 2 cm will only affect the total weight slightly compared to a full cubic meter slab.


How many tons of steel reinforcement are needed for a 100 cubic meter concrete slab?

100 TONS


How do you calculate the area of a rectangular slab?

Multiply the length by the breadth. eg if slab is 2 ft by 3 ft then area of slab = 6 sq feet


How many paving slabs 400mmx400mm in 1 square meter?

To calculate how many 400mm x 400mm paving slabs fit in one square meter, first convert the dimensions of the slab to meters: 0.4m x 0.4m. The area of one slab is 0.16 square meters (0.4m x 0.4m). Therefore, to find how many slabs fit in one square meter, divide 1 square meter by the area of one slab: 1 / 0.16 = 6.25. Since you can’t have a fraction of a slab, you can fit 6 slabs in one square meter, with some leftover space.


How do calculate the weight of 4meter by 1.5 meter concrete slab?

to answer your question, one must know the thickness of the slab? then only the weight can be calculated


Cross sectional area of concrete slab?

The cross-sectional area of a concrete slab is the total area of the slab when viewed perpendicular to its length and width. To calculate the cross-sectional area, you multiply the length of the slab by the width of the slab. This measurement is crucial for determining the amount of concrete needed for a project and for ensuring the structural integrity of the slab.


How can you calculate shuttering material?

Slab area multiply 1.4 times.


How much concrete needed for 12x30 slab?

To calculate the amount of concrete needed for a 12x30 slab, you first determine the area by multiplying the length (30 feet) by the width (12 feet), which equals 360 square feet. If the slab is to be 4 inches thick, convert the thickness to feet (4 inches = 1/3 feet) and then calculate the volume: 360 square feet x 1/3 feet = 120 cubic feet. Since there are 27 cubic feet in a cubic yard, divide 120 by 27 to find that approximately 4.44 cubic yards of concrete is needed.


How many days does it take to dry 1 cubic meter of concrete?

That's going to depend on the shape of the cubic meter, because the drying happens where the concrete is in contact with the air. A slab will dry faster than a cube or a pier.


How do you calculate hourdi blocks in slab?

To calculate hourdi blocks in a slab, first determine the total area of the slab you need to cover. Then, find the area of a single hourdi block, which typically has standard dimensions. Divide the total slab area by the area of one hourdi block to get the number of blocks required. Additionally, consider adding a percentage for wastage and cuts during installation.


How many yards of concretein a slab 20'x16x?

For a standard 4-inch thick slab, this area needs at least 3.95 cubic yards.