Well, you would take the 7000 square feet of dirt and multiply it by the four inches of stone to get the 28000 cubic yards of stone. (28000 yds³)
define the sides in yards, then: area of triangle in sq yards / 4840 = acres
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
we know , calculate the area = 5 X10 =50 ft sq. now,converting feet to yards. 1 sq yard =9 sq.ft . thus,1 sq.yard =50 /9 . =5.55 yards sq.
240 guntas = 29040 sq yards = 6 acres.
it covers about 587 ft sq. maby i not that sure i tried to calculate
Well, you would take the 7000 square feet of dirt and multiply it by the four inches of stone to get the 28000 cubic yards of stone. (28000 yds³)
define the sides in yards, then: area of triangle in sq yards / 4840 = acres
6 metres by 4 metres = 24 square metres. 1 sq metres = 1.1959906 sq yards So, 24 sq. metres = 24 * 1.1959906 = 28.70 square yards
A cubic yard of stone that is 4" thick would cover 9 square yards or 81 square feet. If you need to cover 7000 sq. ft., you would need roughly 86.5 cubic yards. That's a lot of rock.
6 cubic yards of dirt will cover 70 sq ft ... 2 ft 3 3/4 inches deep
You need 100 cubic yards for every 3-ft deep you want to spread it.
0. Do you mean 70 cubic feet? 1 sq yd = 27 cu ft.
we know , calculate the area = 5 X10 =50 ft sq. now,converting feet to yards. 1 sq yard =9 sq.ft . thus,1 sq.yard =50 /9 . =5.55 yards sq.
240 guntas = 29040 sq yards = 6 acres.
24 yards longThe area of a space = length x width. If the area of the floor is 264 sq. yards, and the width is 11 yards, you calculate the length as such:264 / 11 = 24 yards long
400 sq yards.