If it is a cubical block, the volume is simply length x height x width.

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Math & Arithmetic

How do you calculation standard deviation of concrete cubes?

You cannot calculate standard deviation for objects such as concrete cubes - you can only calculate standard deviation for some measure - such as side length, surface area, volume, mass, alkalinity or some other measure.


What is meant by 1 meter cube of concrete?

A metre cube of concrete is a volume of concrete which is equivalent to the volume of a cube each of whose sides are 1 metre long.


How do you calculate volume of concrete placed in slump cone?

Calculate the volume of full cone. For this you need to reproduce the cone surface upto the point where radius becomes zero.Then deduct the volume of the portion which is cut from the full volume. You can't multiply the height to the average of bottom area and top area. Because area (pi.r^2) is the second degree function of radius, not first degree.


How do you calculate rcc hume pipe 1000mm dia np3?

To calculate the RCC (Reinforced Cement Concrete) Hume pipe with a diameter of 1000 mm and NP3 class, you need to determine its dimensions, including the wall thickness and length. The standard wall thickness for NP3 pipes can vary, but it is generally around 50 mm for a 1000 mm diameter pipe. You can then calculate the volume of concrete using the formula for the volume of a cylinder: ( V = \pi \times \left( \frac{D}{2} \right)^2 \times L ) where ( D ) is the outer diameter and ( L ) is the length of the pipe. Finally, multiply the volume by the density of concrete to find the weight of the pipe.


How do you calculate warehouse area from volume?

It is not possible to calculate the area given only the volume.

Related Questions

What is volume batching?

The measuring of the constituent materials for mortar or concrete by volume.


How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


How much concrete for 12 feet by 4.5 feet?

The depth of the pour would also be necessary to calculate the volume of concrete needed.


How do you calculate Concrete volume on corrugated metal decking?

You need several quantities to calculate concrete volume for corrugated metal decking. You need both the flute height in inches, flute width in inches, flute foot in inches, sealant depth or thickness in inches, gap size in inches, and deck length in feet.


How do you calculate the density of different materials?

of course density"Mass/Volume"


How do you calculate the weight of a pre-cast concrete tilt-wall panel?

To calculate the weight of a pre-cast concrete tilt-wall panel, you would need to know the volume of the panel and the density of concrete typically used in such panels. You can then multiply the volume by the density to determine the weight. The formula would be weight = volume x density.


How much does a concrete weigh?

Mass is: M=V x d.To calculate the mass you need to know the density of this concrete and also the volume.


What is weight batching of concrete?

the materials of the concrete are divided into based upon their unit weights. The specific weights are to be known for this . it is different from volume batching


How to measure how much concrete do you need for your project?

To measure how much concrete you need for your project, calculate the volume of the area to be filled with concrete by multiplying the length, width, and height. Then, divide the total volume by the yield of the concrete mix to determine the amount needed in cubic yards or cubic meters.


How much concrete do you need for a slab 45x65 inches?

Oops . . . please repost your question and include the depth of the concrete. You have to have all 3 dimensions in order to calculate volume (Cubic Yards of concrete).


How do you calculate the volume of concrete needed to fill a 55 gallon drum?

To calculate the volume of concrete needed to fill a 55-gallon drum, you first need to know the dimensions of the drum. Once you have the dimensions, you can use the formula for the volume of a cylinder (V = πr^2h) to calculate the volume of concrete required. Remember to convert the volume from gallons to cubic inches or feet for accurate results.


How do you calculate the volume of concrete in a circular slab?

V of a circular slab = thickness of the slab multiplied by (pi multiplied by the radius2)