It will take 12.75 periods.
The expected rate of return is simply the average rate of return. The standard deviation does not directly affect the expected rate of return, only the reliability of that estimate.
no
Risk reflects the chance that the actual return on an investment may be very different than the expected return. One way to measure risk is to calculate the variance and standard deviation of the distribution of returns.Consider the probability distribution for the returns on stocks A and B provided below.StateProbabilityReturn onStock AReturn onStock B120%5%50%230%10%30%330%15%10%320%20%-10%The expected returns on stocks A and B were calculated on the Expected Return page. The expected return on Stock A was found to be 12.5% and the expected return on Stock B was found to be 20%.Given an asset's expected return, its variance can be calculated using the following equation:whereN = the number of states,pi = the probability of state i,Ri = the return on the stock in state i, andE[R] = the expected return on the stock.The standard deviation is calculated as the positive square root of the variance.Note: E[RA] = 12.5% and E[RB] = 20%Stock AStock B
Only if the 1% per month is compounded annually and not monthly.
A -33.33 (recurring) % rate of return.
Net Present Value (NPV) means the difference between the present value of the future cash flows from an investment and the amount of investment.Present value of the expected cash flows is computed by discounting them at the required rate of return. For example, an investment of $1,000 today at 10 percent will yield $1,100 at the end of the year; therefore, the present value of $1,100 at the desired rate of return (10 percent) is $1,000. The amount of investment ($1,000 in this example) is deducted from this figure to arrive at net present value which here is zero ($1,000-$1,000).A zero net present value means the project repays original investment plus the required rate of return. A positive net present value means a better return, and a negative net present value means a worse return.
14
A stock is expected to pay a dividend of $1 at the end of the year. The required rate of return is rs 11%, and the expected constant growth rate is 5%. What is the current stock price?
A stock is expected to pay a dividend of $0.75 at the end of the year. The required rate of return is rs = 10.5%, and the expected constant growth rate is g = 6.4%. What is the stock's current price?
2.0%
The phrase was noted in 1765 as an American expression, meaning 'a present for which an equivalent return is expected'
4%
A tax return could be lower than expected for many reasons. A mistake could have been made while filing or the incorrect amount of taxes were taken out of your check throughout the year, which caused a decrease.
$3.00
The expected rate of return is simply the average rate of return. The standard deviation does not directly affect the expected rate of return, only the reliability of that estimate.
expected rate of return
The IRR on a project is calculated in the same way the YTM on a bond is. Both methods discount the future cash flows of the investment back to the present value and compare them with the appropriate amount; in the case of a bond, it is its current market price while in the case of the IRR method it is zero. The internal rate of return and the yield to maturity are the discount rates that make the present value of expected cash flows equal to the left side of the equation.