To convert hours to days, you divide the number of hours by 24 since there are 24 hours in a day. Therefore, 360 hours divided by 24 equals 15 days. So, 360 hours is equivalent to 15 days.
According to the U.S National Institute of Occupational Safety and Health (NIOSH)'s table of scheduled charges, a fatal injury is equivalent to a loss of 6,000 man days
man hours are the total amount of hours each employee works. For example, 10 men working one 10 hour shift would be 100 man hours.
0.5 hours
somewhere between 105-120
To convert hours to days, you divide the number of hours by 24 since there are 24 hours in a day. Therefore, 360 hours divided by 24 equals 15 days. So, 360 hours is equivalent to 15 days.
That depends on how many men there are. If there is 1 man, then he does 7,000,000 man-hours of work in 7,000,000 hours, or about 798 years of continuous work. If there are 1,000 men, then they do 7,000,000 man-hours of work in 7,000 hours, or about 292 days of continuous work. If there are 100,000 men, then they do 7,000,000 man-hours of work in 70 hours, or about 2.917 days of continuous work. The problem we have with this question is that a "man-hour" is not a unit of time.
Wikipedia's oldest people article says that the oldest woman was 122 years and 164 days old and the oldest man was 120 years and 237 days old. The man's age however has had some dispute. If the 120 year old man's age wasn't true, then the oldest man would be 115 years and 252 days old.
Taking into consideration that each man works an 8 hour work day: (4 x 8) x 48 = 1536 man hours to complete the job for 4 men *** (Men x Man hours per day) x Days Worked = Total Job Man Hours *** 1536 / (3 x 8) = 64 days for 3 men to complete the same job *** Total Job Man Hours / (Men x Man Hours per day) = Days until Job Completion***
According to the U.S National Institute of Occupational Safety and Health (NIOSH)'s table of scheduled charges, a fatal injury is equivalent to a loss of 6,000 man days
3472 days, 5 hours, 21 minutes (approximately)
Leaving the shipyards after 120 days.
6 men took 20 days so it is 120 man-days worth of work. 4 men will take 120/4 = 30 days to do the work.
your not a man if your 120 lbs..
Oh, dude, 144 hours is like 6 days. But hey, who's counting, right? Time is just a construct, man. Just go with the flow and enjoy the ride.
yes
120