Chat with our AI personalities
Oh, dude, if you're talking about standard concrete blocks that are 16 inches long and 8 inches wide, you'd have about 10.8 blocks per square meter if they were laid flat. But hey, who's counting, right? Just make sure you measure twice and lay once, or something like that.
215 days = 7.06 months.
To find out how many times 9 can go into 215, you divide 215 by 9. The quotient is the result of this division. In this case, 9 can go into 215 23 times with a remainder of 8.
215 square feet is about 19.97 square meters.
215 days is equivalent to 30 weeks and 5 days.