Want this question answered?
Be notified when an answer is posted
A metric ton is 1000kg. 1000/40 = 25. 25 bags required.
Perhaps this Guide to Green Coffee Bags will help you.
9.72 Cubic Yards of Concrete is required, if you are going to order by cement truck. 874.8 bags of 40# (40 lbs) bags, or 583.2 bags of 60# 437.4 bags of 80#
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
20
[object Object]
35 or 40
2000
A metric ton is 1000kg. 1000/40 = 25. 25 bags required.
Perhaps this Guide to Green Coffee Bags will help you.
if it is rice, pulses, it will be 450-500 .. same as 20'
Assuming each bag of cement weighs 50 kg (0.05 metric tons), 1 million bags of cement would be equivalent to 50,000 metric tons (1 million bags * 0.05 metric tons).
The amount of 50 kilogram bags that will fit into a 40 foot container is dependent upon the size of the bags. 50 kilogram bags of gold will be much smaller than 50 kilogram bags of feathers.
is it 1120 bags x 50 kg= 56,000 kg's
9.72 Cubic Yards of Concrete is required, if you are going to order by cement truck. 874.8 bags of 40# (40 lbs) bags, or 583.2 bags of 60# 437.4 bags of 80#
It depends on the weight of the sand, but on average, a 50 lb bag of sand equals approximately 0.0227 cubic meters. So, roughly there would be around 44 bags in 1 cubic meter of sand.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over