21
are these concrete blocks and allowing for mortar. 12.5 per square metre, 62.5 per cubic metre with mortar
11 bags
1.09 cu yards is 29.43 cubic feet and sands weighs 100 pounds per cu ft so you need 2943 pounds. Dide by 50 pounds per bag that is 59 bags
Well, darling, if you want a concrete slab that's 5 inches thick, you'll need about 0.012 cubic meters of cement and 0.06 cubic meters of sand per square meter. Just make sure you mix it well and pour it like a boss. Good luck with your project, sugar!
7 bags per 1000 on mortar mix and half a truckload of "mortar" sand aught to do it.
65 BLOCKS PER 74 POUND OF MORTAR (THAT YOU ADD SAND TO) 80 POUND PREMIX MORTAR JUST ADD WATER 27 BLOCK 8X8X16
it is 100 bags of sand/ballast
21
I'll use the density of dry, packed sand, which is 100 lbs per cubic foot, 50/100 is 2 50 lb bags of sand
The volume of sand weighs 455x 2/12 *100 pounds per cubic foot = 7600 pounds so you need about 152 bags.
are these concrete blocks and allowing for mortar. 12.5 per square metre, 62.5 per cubic metre with mortar
If a 20kg bag of cement=0.1m3 with 100 lots o 0.01 to 1m3 then you will need 12.5 bags per m3. So you need approx 11.5m3 of sand and 144 bags of cement (144 x 0.01 = 1.44m3) to give you a total of 12.94m3
11 bags
About two bags per square foot.
not a lot. but assuming 9"x3" and using this brick calculator it works out at 0.0003 cubic meters of mortar or 0.91kg of sand and 0.25kg of cement per brick.
for preparing cement mortar C.M.(1:6) number of cement bags required are nearly 5.14 bags.calculation: for preparing 1 cu.m wet C.M(1:6), dry material required is 25% extra.therefore dry material required is 1.25 cu.mhence cement required=1.25/(1+6)=0.178 cu.m(sand required=0.178*6=1.068 cu.m)density of cement=1440 kg/cu.m=>cement required in kg=0.178*1440=256.32cu.mwt. of cement in kg per bag=50kgtherefore no. of bags required is=26.32/50=5.14bags.thank u.