According to Blue Circle it takes 108 bags of concrete to get a cubic meter
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
15 milligrams
one bag
4000PSI, 12bags, .5cum3sand 1cu.m3 gravel
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
15 milligrams
M20 - 6.20bags
For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.
108
one bag
4 bags of 50 kg each= 200 kg of cement.
4000PSI, 12bags, .5cum3sand 1cu.m3 gravel
11 bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
It would depend on how big the bag of cement is. 1 foot bags will be more in the cubic meter than 2 feet.