150
All depends how high you want to build the walls. You'll have to decide that before you start.
The average construction cost per square foot in central Virginia is about $125. This means a 200 square foot building would cost about $25,000 to build.
The construction cost per square foot in Asheville, North Carolina is about $88 per square foot. This means a 3000 square foot building would cost about $264,000 to build.
When you say 1 foot block, are they square blocks with side equal to 1 foot, in that case you would need 240 blocks
Dimensions x whatever is the going rate at your local cement contracter... usually by the square foot
150
To calculate the number of 6-inch blocks one bag of cement can lay, we first need to determine the volume of one bag of cement. A standard bag of cement typically weighs 94 pounds and has a volume of approximately 1 cubic foot. Assuming the blocks are standard 6-inch concrete blocks (with dimensions of 8 inches by 8 inches by 16 inches), one bag of cement can lay approximately 12 blocks. This calculation is based on the assumption that each block requires about 0.83 cubic feet of concrete, and a bag of cement can yield roughly 1.2 cubic feet of concrete when mixed with water and aggregates.
3 cement bricks for foot
All depends how high you want to build the walls. You'll have to decide that before you start.
$80 psf
No. It was poured in 25 foot rectangular blocks, so each block would cure before pouring the next.
The cost to build a house in Kansas is about 100 per square foot to 125 per square foot. The final cost depends on the builder and the building materials that you use.
Between 95 and 110 dollars per square foot.
It depends on the building codes in the area you live.
What is the typical per square foot cost to build in New Hampshire (not including land)?
fifty dollars