It takes 5.0926 cubic yards or 137.5 cubic feet.
1.851852 cubic yards
6.67 cubic yards
None because it's a hole but 6 cubic yards of dirt will fill it up.
5' * 3' * 2' = 30 cubic feet = 30/(3*3*3) cubic yards = 1.11... cubic yards.
500 sq ft X 1/12 ft / 27 cubic ft./cubic yard = 1.5 cubic yards
15.833... [cubic] yards.
You already have a square yard of topsoil, so how does 20 inches of depth get you the volume of topsoil? There are 36 inches in a yard, and you have 20 inches of topsoil depth that's 20/36ths of a yard of topsoil depth. That's 0.555... or about 0.56 yards. The volume of topsoil is 1 yard by 1 yard by 0.56 yards, or about 0.56 cubic yards of topsoil.
if that is 3 ft deep it would require 96 yards... IF it is 3 inches deep it would require 24 cubic yards
84.
1,000,000 cubic yards.
1 acre = 43,560 square feet6 inches = 1/2 footVolume of topsoil = (43,560 square feet) times (1/2 foot) = 21,780 cubic feet1 cubic yard = 27 cubic feet(21,870 cubic feet) / (27 cubic feet per cubic yard) = 806 and 2/3 cubic yards
672.28 cubic yards.
3,226,666.7 cubic yards.
62/3 cubic yards for every 1-foot deep. 5 cubic yards for every 9-inches deep. 31/3 cubic yards for every 6-inches deep. 5/9 cubic yard for every 1-inch deep.
Three acres three inches deep is 403.33 cubic yards.
1 acre = 4840 square yards, so 1 acre 20 yards deep = 4840*20 = 96,800 cubic yards.
14.8 yards