I assume you mean months which about 2 months are in 60 days. If not 60 days are in 2 months. Then maybe its in 3 months in a half
Anything from 2 months + 6 days to exactly 2 months - depending on which months are picked.
84 days is about 2¾ months. (2.75 average months, 2 months and 23 days). There is no fixed number of days in a month, but the average is 30.4 days a month.
About 2.4 months, as months average 30.4 days (they are not a fixed length). This is about 2 months and 13 days.
75 to 77 days (depending on the months).
I assume you mean months which about 2 months are in 60 days. If not 60 days are in 2 months. Then maybe its in 3 months in a half
Anything from 2 months + 6 days to exactly 2 months - depending on which months are picked.
84 days is about 2¾ months. (2.75 average months, 2 months and 23 days). There is no fixed number of days in a month, but the average is 30.4 days a month.
About 2.4 months, as months average 30.4 days (they are not a fixed length). This is about 2 months and 13 days.
75 to 77 days (depending on the months).
About 2 months.
72 days is approximately 2 1/3 months.
2
If the months are 31 days long, then there are 3,694,7200 seconds
2 months or 2 months and a day (average month is 30.4 days) * * * * * Or 2 months exactly: Dec+Jan or Jul+Aug Or 2 months + 3 days: Jan+Feb in a non-leap year
Near enough 2 months. Although 2 months can also be 59, 61 or 62 days.
Depends on the number of days in the months. There can be anything from 2 months (Dec-Jan or Jul-Aug) and 6 days to 2 months (Jan-Feb or Feb-Mar), 1 week and 2 days.