The number of days required for lifting a precast unit from the bed typically depends on several factors, including the curing time of the concrete, the type of precast unit, and environmental conditions. Generally, precast concrete elements may require a minimum of 3 to 7 days for sufficient curing before lifting, but full strength may take longer. It's essential to consult project specifications and guidelines to determine the exact timeframe for each specific case.
15 days
1 week = 7 days. You now have all the information required to answer this and similar questions.
If 42 men can complete a job in 15 days, the total work can be expressed as man-days, which is 42 men × 15 days = 630 man-days. To determine how many men are required to complete the same work in a different number of days, you would divide 630 by the desired number of days. For example, if you want to complete the work in 10 days, you'd need 630 man-days ÷ 10 days = 63 men.
96 x 24/20 = 116 for first 4 days and 115 for remaining 16 days
1 day = 24 hours. You now have all the information required to work out, for yourself, the answer to this and similar questions.
15 days
10 days
how many working days are required in cbse school of INDIA
190 days are required for St.George Utah though the national average is 181 days
100-120 days
1 month.
not days buddy only 3 hours
haha the answer is 37.29999993 days
180 days are required.
7.64 days
45 days
How many days are you allowed off sick before a medical certificate is required