The number of days required for lifting a precast unit from the bed typically depends on several factors, including the curing time of the concrete, the type of precast unit, and environmental conditions. Generally, precast concrete elements may require a minimum of 3 to 7 days for sufficient curing before lifting, but full strength may take longer. It's essential to consult project specifications and guidelines to determine the exact timeframe for each specific case.