answersLogoWhite

0


Best Answer

7

User Avatar

Anonymous

Lvl 1
4y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How many hours is 830 to 500 pm with 1 hour lunch?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How many hours is 830 to 500 Minus half hour for lunch?

Eight hours.


How many hours in 500 miles at 70 miles per hour?

7 hours 2 minutes.


How many hours would a spacecraft travelling at 500 miles per hour reach the moon?

Approximately three weeks at 500 miles per hour.


How many hours are there if you divide 500.00 dollars by 43.00 dollars per hour?

500 dollars at 43.00 dollars per hour implies 11.628 hours or 11 hours 37.7 minutes.


How many hours would it take to drive 500 miles driving 60 miles an hour?

8 and 1/3 hours


How many hours is 500 mins?

Problem:500 minutes = ? hoursConversion(s):1 hour = 60 minutesStart with 500 minutes. Arrange a fraction, so that minutes cancels (this is called dimensional analysis), or basically ( 1 hour / 60 minutes ). That reads for every 1 hour there are 60 minutes.( 500 minutes ) x ( 1 hour / 60 minutes ) = 500/60 hoursThe point here is units can cancel out, just like numbers can, using a fraction.500/60 hours = 50/6 = 25/3 hours ~= 8.333 hours.So 500 minutes is equal to about 8.333 hours.


How many hours is 500 minutes?

8 hours and 20 minutes 60 minutes = 1 hour 500minutes/60 minutes = 8.333 hours or 8 1/3 hour or 8 hours 20 minutes (since 20 minutes is 1/3 of an hour)


How many hours will it take to go 430 miles if your traveling at 500 miles per hour?

About 52 minutes.


How many hours would it take to drive 500 mile at 65 miles per hour?

7 hours, 41 minutes, 32.3 seconds


If you had 500 students and 25.0 percent ate lunch how many is that?

500 * 0.25 = 125 students.


How maney hours does it take to drive 500 miles?

At 100 miles an hour, 5 hours.


If there are 1500 loads every 60 minutes how many are ther in 24 hours?

60 minutes is the as an hour so if in 1 hour the is 1 500 loads therefore for 24 hours it will be 36 000 loads