Exactly 270.
270 minutes. 4X60+30=270.
270 / 60 = 4.5 minutes
4.5 minutes
That would be 270 minutes. 60 minutes in an hr. x 4 = 240 + 30 = 270
270 minutes.
270 minutes. 4X60+30=270.
270 / 60 = 4.5 minutes
4.5 minutes
That would be 270 minutes. 60 minutes in an hr. x 4 = 240 + 30 = 270
270 minutes.
270 mins
270 minutes.
4 hours and 30 minutes.
4 minutes and 30 seconds.
270 min.😉
(270 min) / (60 min/hr) = 4.5 hr
Four and one half hours in 270 minutes