Wiki User
∙ 16y agoYou install a three ton geothermal heat pump system
Wiki User
∙ 16y agoif you have normal ceiling height(below 10ft) a 2 1/2 ton should be fine.
375 tiles, minus the number of light fixtures or other things that take the place of one tile. (You ARE putting light and air in that cavern, no ?)
That's going to depend on . . . -- how many square feet 1 gallon of paint covers -- whether you want to paint any of the walls ---- if so, how many, and the height of the ceiling above the floor -- whether you want to paint the ceiling -- whether you want to paint the floor None of these parameters is given in the question. We therefore don't stand a chance.
That's going to depend on - the beginning temperature in the room, before you light the heater - the relative humidity inside the room - the height of the room, floor to ceiling - the rate of heat loss ('R'-value) of the floor, ceiling, and walls - the temperature outside the room - the means of air circulation in use inside the room. In general, unless the temperature outside the room is 120 or higher, you can never turn off the heater for good.
you take your number and move it 2 places to the left(making it a decimal), multiply by 360 and after you've found your product move the decimal poitn the amount of places needed.
Boiler . More information is needed is needed as to what exactly this boiler is and what connection it has to the ceiling. You are possibly referring to an in floor heating system or a hydronic heating system. We need more facts to get to a sensible answer.
14.4 .About 15
You can install heating ducts into a suspended ceiling by cutting a hole in the ceiling tiles where the duct will go, attaching the ductwork to the ceiling joists above the suspended ceiling, and sealing any gaps around the duct. Make sure to follow local building codes and consult with a professional if needed to ensure safe and efficient installation.
hell was needed
big one
we needed a central voice to represent america
Central planning is needed to mitigate possible negative outcomes when a natural, or man made disaster occur. Central planning makes preparations to provide the basic human needs to the population of a given area.
The wigged man pointed out that there was a leak in the ceiling which needed immediate attention before it caused further damage to the council chambers.
Federalists
One could look at the size of the room, the colors of the walls, floor and ceiling, how they relate to the colors of the furniture and their spatial relations. The light will be reflected by all the objects in the room and the six sides a room has (floor, walls, ceiling). Based on this information one can have an intuition about what lighting would be needed.
A flush beam is a beam that is flush the the surrounding floor or ceiling joists. Often held in place with metal connectors. It could be a steel 'I' beam, lvl, built up wood. It is used when ceiling height is needed to be maintained.
3 x 8 = 24, so 3 plywood lengths will fit the width of the ceiling. 9 x 4 = 36, so 9 plywood widths will fit the length of the ceiling. 3 x 9 = 27 sheets of plywood are required.