The answer depends on how deep the coverage will be. River Rock weighs 2,800 LBS. per cubic yard - That's 1.4 tons per cubic yard. One ton = 2,000 LBS. 2,000 divided by 2,800 equals roughly 0.71. So one ton of river rock is roughly 0.71 cubic yards. 0.71 cubic yards covers roughly 230 square feet 1" deep 0.71 cubic yards covers roughly 115 square feet 2" deep 0.71 cubic yards covers roughly 77 square feet 3" deep 0.71 cubic yards covers roughly 57 square feet 4" deep 0.71 cubic yards covers roughly 38 square feet 5" deep
200 cubic feet or 7.4 cubic yards
123.44 cubic yards
6 inches = 0.5 feet 256 square feet * 0.5 = 128 cubic feet There are 27 cubit feet in a cubic yard (3 feet x 3 feet x 3 feet), so 128 cubic feet = 4.741 cubic yards.
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
The answer depends on how deep the coverage will be. River Rock weighs 2,800 LBS. per cubic yard - That's 1.4 tons per cubic yard. One ton = 2,000 LBS. 2,000 divided by 2,800 equals roughly 0.71. So one ton of river rock is roughly 0.71 cubic yards. 0.71 cubic yards covers roughly 230 square feet 1" deep 0.71 cubic yards covers roughly 115 square feet 2" deep 0.71 cubic yards covers roughly 77 square feet 3" deep 0.71 cubic yards covers roughly 57 square feet 4" deep 0.71 cubic yards covers roughly 38 square feet 5" deep
One cubic yard of mulch will cover approximately 160 square feet at 2" deep, so you would need approximately two cubic yards of mulch to cover 271 square feet at 2" deep.
136 square feet * 3 feet = 15.11... cubic yards.
200 cubic feet or 7.4 cubic yards
4860 sq feet
123.44 cubic yards
336 square feet X .5 feet = 168 cubic feet 168 cubic feet / 27 cubic feet per cubic yard = 6.22 cubic yards.
6 inches = 0.5 feet 256 square feet * 0.5 = 128 cubic feet There are 27 cubit feet in a cubic yard (3 feet x 3 feet x 3 feet), so 128 cubic feet = 4.741 cubic yards.
You cannot "fill" a cubic measurement with a square measurement.I think you meant cubic yards.1 cubic yard = 27 cubic feet.Your concrete slab is 1600 x 4/12 cubic feet = 533.333333... cubic feet.533.333333... cubic feet / 27 = 19.753 cubic yards (rounded to third decimal).
There are 810 cubic yards in 6 acres of land that is 3 feet deep. This calculation is based on the conversion factor that 1 acre equals 4840 square yards and that 1 cubic yard equals 27 cubic feet.
154 square feet x 0.5 feet deep = 77 cubic feet. 1 yard = 3 feet so 1 cubic yard = 3 feet x 3 feet x 3 feet = 27 cubic feet. 77 cubic feet * ( 1 cubic yard / 27 cubic feet ) = 2.85 cubic yards. so buy 3.
240 cubic feet = about 8.9 cubic yards. (8.88888889 cubic yards).