answersLogoWhite

0


Best Answer

There are 9 square feet in one square yard. Therefore, 680 square feet is equal to 680/9 = 75.5 recurring (that is, 75.5555...) square yards.

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How many square yards are there in 680 square feet?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How many miles are in 680 yards?

Answer: 680 yd = 0.386363 miles.


How many yards of concrete would it take to cover a 20' x 34' area 4 inches thick?

An area 20ft x 34' is 680 square feet. 4 inches is 1/3 of a foot so cubic feet required is 680 x 1/3 = 226.7 cubic feet. There are 3x3x3 = 27 cubic ft in a cubic yard. Therefore cubic yards required = 226.7/27 = 8.4 cubic yards


How many feet is 680 mm?

About 2.23 feet are in 680 millimeters.


What is the square footage of a combined area of 34x20 feet?

34x20=680


How many feet are in 680 centimeters?

There are 30.48 centimetres in one foot. Therefore, 680 centimetres is equal to 680/30.48 = 22.31 feet.


How many meters are there in 680 feet?

One foot is equal to 0.3048 metres. Therefore, 680 feet is equal to 0.3048 x 680 = 207.264 metres.


How many miles are in 31 680 feet?

There are 6 miles in 31,680 feet


How many square feet is 20 ft x 34 ft house?

Answer = 20 ft x 34 ft = 680 sq ft


How many meters in 680ft?

680 feet is 207.264 metres.


How many sq feet will a 15000btu heating?

The amount of feet per btu varies according to many factors such as how tall the ceiling is or how many windows there are. In most houses, usually you need about 20 to 22 btu per square foot. So, divide 15000 by these and you get it will heat anywhere from about 680 to 750 square feet.


How many yards of concrete do you need for a project 40 by 17 by 4 inches?

approx. 74 yards Sorry, Dabar, but I think you have not accounted for the conversion of cu. feet to cubic yards...my calculations are as follows...... 40 X 17 is equal to 680 cubic FEET of area. You take the 680 and divide by 27 to get the cu. YARDS of concrete. (25.1 cu. yds) Then because you only want the slab 4 inches thick, you multiply by .33 (or 8.25 cu. yards of concrete) Then you allow 10 % for waste or shortage....(make this about a yard...so, 8.25 and one for waste/shortage is equal to 9.25 cu. yards of Concrete for this project)


What is the square root 680?

The square root of 680 is an irrational number and it is about 26.0768 rounded to 4 decimal places