7 days = 1 week ⇒ 500 days = 500 ÷ 7 weeks = 713/7 weeks ≈ 71.429 weeks
It is: 0.014 or 7/500 of a yard
7/500 = 0.014
7/5 of 500 is 700.
Oh, dude, let's break out the calculator for this one. So, 500 divided by 64 gives you about 7.8125. But, like, you can't have part of a division, so technically, 64 goes into 500 about 7 times. Math can be such a buzzkill, right?
500 divided by 7 equals 71 with a remainder of 3.
7
63 can go into 500 a total of 7 times, with a remainder of 11.
500 divided by 7 is 71 with remainder 3. (71.428571428571429 times)
7 with remainder 59.
500+7
70 goes into 500. seven times
There are 500/7 of them.
goes in 5 times
7 days = 1 week ⇒ 500 days = 500 ÷ 7 weeks = 713/7 weeks ≈ 71.429 weeks
it will be 7
16,500