Answer: 1600 m² = 17,222.256 ft² OR 17,222 ft² and 36.96 in²
Infinitely many.
Answer: 1600 m² = 17,222.256 ft²
There are many variables but 3 tons of air conditioning is enough to cover 1750 sq ft.
How many tons of lime stone is needed to build a wall 6 ft high 936 sq ft
Answer: 1600 m² = 17,222.256 ft² OR 17,222 ft² and 36.96 in²
Infinitely many.
Since the hole has a volume of 1600 ft3, and (we'll assume dry, unpacked) sand has a density of about 95 lb/ft3, we get a mass of about 152,000 lb, or 76 short tons.
There are 43,560 sq. ft. in 1 Ac.
Answer: 1600 m² = 17,222.256 ft²
4 ton
3.5 Tons
There are many variables but 3 tons of air conditioning is enough to cover 1750 sq ft.
How many tons of lime stone is needed to build a wall 6 ft high 936 sq ft
40 x 40 = 1600 sq ft
1 sq yd = 1 yd * 1 yd = 3 ft * 3 ft = 9 sq ft So 1600 sq ft = 1600/9 sq yds = 177.77... sq yds.
The number of city blocks in 1500 feet can vary depending on the city's block size. In a typical city block in the U.S., which is usually around 300 feet long, 1500 feet would be equivalent to 5 city blocks. However, in cities with smaller blocks, such as Manhattan, where blocks are around 200 feet long, 1500 feet would be equivalent to 7.5 city blocks. It is important to consider the specific context and dimensions of the city blocks in question to determine the exact number.