About 30 weeks. A month is not a fixed number of days, but averages 30.4 days. So 7 months is 213 days, or 30 weeks and three days.
Two months, roughly.
31 weeks is 7 monts and three weeks!
224 days = 32 weeks = 7 months 2 weeks.
There are approximately 30.44 days in a month on average, which means 7 months would be about 213.08 days. Since there are 7 days in a week, you can divide 213.08 by 7 to get roughly 30.4 weeks. Therefore, there are about 30 to 31 weeks in 7 months.
A fortnight is equal to 14 days (or two weeks). Thus, a 7 month period would be equal to 14 fortnights. The math: 7 months = 28 weeks 1 fortnight = 2 weeks 28/2 = 14 fortnights.
28 weeks is 7 months exactly. So you are 7 months and 1 week.
7 months and three weeks
Two months, roughly.
31 weeks = 7 months and 1 week.
3 months and 2 weeks.
Its depends on the months, but approximately 30.
Approximating a month at 4 weeks, 7 weeks and 6 days is approximately 2 months.
31 weeks is 7 monts and three weeks!
One month and three weeks
7 1/2 months
224 days = 32 weeks = 7 months 2 weeks.
Actually you are not less than 6 months, you are 7 months and two weeks. Month 7 consist of weeks 27-30. Because they are actually pregnant for 10 months not 9.